background image

Section 6

6-1 

Models RD30/RC25 

Operating Procedures 

 6

Operating Procedures

We begin our instructions at the point when the parts are 
disassembled and laid out to air-dry from the previous 
night’s cleaning.

The following procedures will explain how to assemble 
the parts into the freezer, sanitize them, and prime the 
freezer with fresh product.

If you are disassembling the machine for the first time or 
need information to get to this starting point in our 
instructions, go to “Disassembly” on page 6-9, and start 
there.

Assembly

WARNING! 

Make sure the control switch is in 

the OFF position to eliminate the chance of moving parts.

 

 

Failure to follow this instruction may result in severe 
personal injury from hazardous moving parts.

Note:

When lubricating parts, use an approved 

food-grade lubricant (example: Taylor Lube HP). Every 3 
months discard rubber parts and install new rubber parts.

1. Lubricate the O-ring groove. Slide the O-ring into the 

first groove on the driveshaft. Lubricate the groove, 
O-ring, and shaft portion that comes in contact with 
the rear shell bearing on the beater driveshaft. 

Do 

not

 lubricate the square end of the driveshaft.

Figure 6-1

2. Slide the seal over the shaft until it snaps into the 

groove. Fill the inside portion of the seal with 
lubricant and evenly lubricate the flat side of the seal 
that fits onto the rear shell bearing.

Figure 6-2

3. Install the driveshaft into the freezing cylinder, square 

end first. The driveshaft seal must fit securely over 
the rear shell bearing. Make sure the driveshaft fits 
into the drive coupling without binding.

Figure 6-3

WARNING! 

Use extreme caution

 

when 

handling the beater assembly.

 

The scraper blades are 

very sharp and may cause injury.

Apply the appropriate 
Taylor approved food safe lubricant.

HP

Apply the appropriate 
Taylor approved food safe lubricant.

HP

Apply the appropriate 
Taylor approved food safe lubricant.

HP

Содержание RD30

Страница 1: ...OPERATOR S MANUAL Model RD30 and RC25 Remote Slush Freezer 11 99 Original Publication Updated 10 16 2020 Original Operating Instructions 051060 M...

Страница 2: ...____ Cycle__________ Phase__________________________________ Maximum Fuse Size ______________________________________________________ A Minimum Wire Ampacity __________________________________________...

Страница 3: ...er Interface Control Switch 5 1 Fill Switch 5 1 Mix Out Light 5 1 Viscosity Control 5 1 Section 6 Operating Procedures Assembly 6 1 Sanitizing Without Post Mix Valve 6 5 Sanitizing With Post Mix Valve...

Страница 4: ...ii 051060 M Table of Contents Section 8 Troubleshooting Guide Section 9 Parts Replacement Schedule Section 10 Limited Warranty on Equipment Section 11 Limited Warranty on Parts...

Страница 5: ...njury or death from electrical shock or hazardous moving parts as well as poor performance or damage to the machine Note All repairs must be performed by a Taylor service technician WARNING This machi...

Страница 6: ...be performed by an authorized Taylor service technician The main power supplies to the machine must be disconnected prior to performing installation repairs or maintenance For Cord Connected Machines...

Страница 7: ...ansion CAUTION Use only approved refrigerant listed on the machine s data label or authorized through a manufacturer s technical bulletin The use of any other refrigerant may expose users and operator...

Страница 8: ...f 7 If necessary adjust viscosity to produce satisfactory product Adjustments are made by turning the viscosity adjustment screw located on the front panel clockwise for a thicker product or countercl...

Страница 9: ...Your Taylor warranty is valid only if the parts are authorized Taylor parts purchased from the local authorized Taylor distributor and only if all required service work is provided by a Taylor service...

Страница 10: ...act known to any technician he she employs It should also be noted that Taylor does not warrant the refrigerant used in its equipment For example if the refrigerant is lost during the course of ordina...

Страница 11: ...tion is marked by the equipotential bonding symbol 5021 of IEC 60417 1 on both the removable panel and the machine s frame WARNING This machine must NOT be installed in an area where a water jet or ho...

Страница 12: ...This machine must be placed on a level surface Extreme care should be taken when moving for any reason Two or more persons are required to safely move this machine Failure to comply may result in per...

Страница 13: ...r Hopper 049081 3 Retainer Clip 049419 4 Panel A Rear X48983 5 Panel Side Right 048977 6 Leg A 4 3 8 16 Stud w Cap X43408 7 Panel Side Left 048975 8 Stud Freezer 034035 Item Description Part No 9 Wash...

Страница 14: ...047358 1c Plate Draw Spout Mounting 049275 1d Spout Door Zero Waste 049276 1e O ring 2 375 OD x 1 16 W 046830 1f Spring Comp 845 x 055 x 3 5 047357 1g Valve Draw Zero Waste 047353 1h O ring 7 8 OD x...

Страница 15: ...n enables the fill module to replenish and maintain product levels in the freezing cylinder and in the hopper The OFF position terminates the fill function The refrigeration system is disabled when th...

Страница 16: ...5 2 USER INTERFACE Models RD30 RC25 User Interface 5 Notes...

Страница 17: ...bber parts and install new rubber parts 1 Lubricate the O ring groove Slide the O ring into the first groove on the driveshaft Lubricate the groove O ring and shaft portion that comes in contact with...

Страница 18: ...nd slide the assembly into position over the driveshaft Turn the beater slightly to make sure that the beater is properly seated Figure 6 6 Note When in position the beater will not protrude beyond th...

Страница 19: ...ert the draw valve and spring into the door spout until the threaded end of the shaft passes through the hole in the end of the door spout Thread the draw valve knob onto the end of the draw valve sha...

Страница 20: ...or will protrude through the hole in the center of the door Figure 6 17 18 Install the handscrews on the studs Tighten the screws equally in a crisscross pattern Do not overtighten the handscrews Figu...

Страница 21: ...system Place the fill switch in the OFF position and drain any remaining solution from the freezing cylinder Figure 6 22 Important The machine must not be placed in Auto mode until all sanitizing sol...

Страница 22: ...placed in Auto mode until all sanitizing solution has been removed from the freezing cylinder and proper priming procedures have been completed Failure to follow this instruction may result in damage...

Страница 23: ...nt The machine must not be placed in Auto mode until all sanitizing solution has been removed from the freezing cylinder and proper priming procedures have been completed Failure to follow this instru...

Страница 24: ...while the control switch is in the AUTO position Closing Procedure To disassemble the Model RD30 the following items will be needed Two cleaning pails Cleaning brushes provided with freezer Cleaner S...

Страница 25: ...r assembly scraper blades torque rotor and driveshaft and take these parts to the sink for cleaning 2 Remove the front drip tray and splash shield and take them to the sink for cleaning Brush Cleaning...

Страница 26: ...6 10 OPERATING PROCEDURES Models RD30 RC25 Operating Procedures 6 Notes...

Страница 27: ...ns Read and follow label directions carefully Too strong of a solution may damage the parts and too weak of a solution will not do an adequate job of cleaning or sanitizing Clean and sanitize the prod...

Страница 28: ...reezer by following certain precautions particularly if the building is subject to freezing conditions Your local Taylor distributor can perform this service for you 1 Disconnect the freezer from the...

Страница 29: ...The torque arm is missing or bent b Install or replace the torque arm 6 5 c The viscosity adjustment screw needs to be adjusted c Adjust the screw accordingly 1 3 5 1 d Improper mixing of product d F...

Страница 30: ...ot freezing product when placed in the Auto mode a The torque rotor is bound leaving the torque arm in the cold position Therefore the compressor will not run a Free the torque rotor b The torque arm...

Страница 31: ...Part Description Every 3 Months Every 6 Months Annually Scraper Blade Inspect and replace if necessary Minimum Driveshaft Seal X Freezer Door O ring X Door Port O ring X Front Bearing X Door Spout O...

Страница 32: ...9 2 PARTS REPLACEMENT SCHEDULE Models RD30 RC25 Parts Replacement Schedule 9 Notes...

Страница 33: ...manufacture as indicated by the Product serial number Proof of purchase may be required at time of service 2 This limited warranty is valid only if the Product is installed and all required service w...

Страница 34: ...costs from any reason whatsoever 12 Damages resulting from the use of any refrigerant other than that specified on the Product s data label will void this limited warranty 13 Any cost to replace refi...

Страница 35: ...ified proof of purchase may be required at time of service 2 This limited warranty is valid only if the Part is installed and all required service work in connection with the Part is performed by an a...

Страница 36: ...g warranty service work promptly upon arrival 9 Failure damage or repairs due to faulty installation misapplication abuse no or improper servicing unauthorized alteration or improper operation or use...

Страница 37: ...R INCIDENTAL DAMAGES INCLUDING CLAIMS FOR LOST SALES LOST PROFITS PRODUCT LOSS PROPERTY DAMAGES OR SERVICE EXPENSES ARE EXPRESSLY EXCLUDED THE EXPRESS WARRANTIES MADE IN THIS LIMITED WARRANTY MAY NOT...

Страница 38: ...11 4 LIMITED WARRANTY ON PARTS Models RD30 RC25 Limited Warranty on Parts 11 Notes...

Отзывы: