6-8
OPERATING PROCEDURES
Model C706
Operating Procedures
6
4.
Install the pump assembly. To position the pump on
the drive hub at the rear of the mix hopper, align the
drive hole in the piston with the drive crank of the
driveshaft. Secure the pump in place by slipping the
pump clip over the collar of the pump, making sure
the clip fits into the grooves in the collar.
Figure 6-28
5.
Place the power switch in the ON position.
Figure 6-29
6. Press the WASH key. This causes the sanitizing
solution in the freezing cylinder to agitate. Allow it to
agitate for 5 minutes.
Figure 6-30
7. With an empty pail beneath the door spout, raise the
prime plug and press the PUMP key.
Figure 6-31
12309
13063
13110
10505
Содержание C706
Страница 8: ...1 4 TO THE INSTALLER Model C706 To the Installer 1 Notes ...
Страница 14: ...3 4 SAFETY Model C706 Safety 3 Notes ...
Страница 36: ...6 14 OPERATING PROCEDURES Model C706 Operating Procedures 6 Notes ...
Страница 42: ...8 4 TROUBLESHOOTING GUIDE Model C706 Troubleshooting Guide 8 Notes ...
Страница 44: ...9 2 PARTS REPLACEMENT SCHEDULE Model C706 Parts Replacement Schedule 9 Notes ...
Страница 48: ...10 4 LIMITED WARRANTY ON EQUIPMENT Model C706 Limited Warranty on Equipment 10 Notes ...
Страница 52: ...11 4 LIMITED WARRANTY ON PARTS Model C706 Limited Warranty on Parts 11 Notes ...