Section 9
9-1
Models C001 and C002
Parts Replacement Schedule
9
Parts Replacement Schedule
Table 9-1
Part Description
Every 3 Months
Every 6 Months
Annually
Front Bearing
X
Inner Flow Regulator O-rings
X
Draw Plate O-ring
X
Freezer Door O-ring
X
Driveshaft Seal
X
Scraper Blades
X
Black Bristle Brush - 1” x 2”
Inspect and replace if
necessary.
Minimum
Double Ended Brush
Inspect and replace if
necessary.
Minimum
White Bristle Brush - 3” x 7”
Inspect and replace if
necessary.
Minimum
Содержание C001
Страница 22: ...5 4 USER INTERFACE Models C001 and C002 User Interface 5 Notes...
Страница 36: ...9 2 PARTS REPLACEMENT SCHEDULE Models C001 and C002 Parts Replacement Schedule 9 Notes...
Страница 40: ...10 4 LIMITED WARRANTY ON MACHINES Models C001 and C002 Limited Warranty on Machines 10 Notes...
Страница 44: ...11 4 LIMITED WARRANTY ON PARTS Models C001 and C002 Limited Warranty on Parts 11 Notes...