17
Model 432 Tim Hortons
Operating Procedures
141219
Step 6
Insert the torque rotor end with the guide bearing
into the pilot hole in the center of the drive shaft. The
hole in the torque rotor shaft should be rotated to the
12 o'clock position.
Figure 11
Step 7
Assemble the freezer door with the “Ice Buster”
(door spout clearing device). To assemble the door
with the ice buster, install the o-rings on the draw
valve and lubricate.
Figure 12
Step 8
Insert the draw valve into the door, leaving
approximately 1/2 of the valve sticking out the top of
the door.
Figure 13
Step 9
Rotate the draw valve so the flats on the top of the
draw valve are perpendicular to the door face.
Figure 14