Страница 1: ...INSTALLATION MANUAL CONCRETE ADVANCED BLOWER SYSTEM ABS ABSNR...

Страница 2: ...ABS Standard Lifting Instructions 9 c ABS Tall 400 Excavation Instructions 10 d ABS Tall 400 Lifting Instructions 11 e ABS Tall 600 Excavation Instructions 12 f ABS Tall 600 Lifting Instructions 13 1...

Страница 3: ...EN WET During cleaning maintenance repair work the surrounding area may become extremely slippery due to spilt water Caution is to be taken when walking standing near the ABS when these activities are...

Страница 4: ...oil moisture for heavy equipment access Weather conditions 5 MARK OUT To ensure the ABS is installed in the position nominated by the Home Owner Builder the location of the ABS should be marked out pr...

Страница 5: ...n behind the vehicle before placing it into the prepared hole Maximum reach from the rear of the truck to the centre of ABS will vary depending on the size of the crane To enable the ABS to be unloade...

Страница 6: ...Page 5 of 15...

Страница 7: ...cess is the responsibility of the property owner builder 7 INSTALLATION Always ensure the installation location include the future landscaping provision allow for the diversion of stormwater and surfa...

Страница 8: ...ibuted layers around the tank perimeter Ensure that sand or excavated material does not fall on the lid of the ABS as this will fall into the system through the manholes and clog the system and irriga...

Страница 9: ...mm drainage gravel or sand 4 Ensure bottom of hole is level 5 Back ll with soil from Excavation in no more than 500mm equally distributed layers around the tank Avoid back lling with rocks over 300mm...

Страница 10: ...hrough TOP lifting holes provided in the lid of the ABS 3 Loop chains through the lifting holes directly below on the inside wall of the ABS 4 Steel reinforcing bars have been installed inside the con...

Страница 11: ...distributed layers around the tank Ensure there is no backfilling with rocks over 300mm 6 To prevent flotation fill the ABS with 5 000lt of water immediately through hole above the aeration chamber s...

Страница 12: ...p and blower to the double GPO s Turn all 3 GPO Switches ON Taylex Electrical Connection Diagram TITLE DATE Taylex ABS ABSNR 01 01 2023 TAYLEX ABS ABNSNR ELECTRICAL CONNECTION DIAGRAM Electrician Conn...