3.2 Storage
The packaged Rec15/25 should be stored in dry storage areas with natural ventilation.
WARNING!
It is not permitted to stack more than two packages during storage.
Unpacked and assembled equipment can be stored before installation. Keep it in a clean, dry location with
sufficient air circulation and temperature to prevent condensation. Insulation must be protected against dirt
and moisture.
3.3 Inspection
Each Rec15/25 is completely assembled, tested, and inspected at the factory. It is in good condition when
accepted by the carrier for shipment. Upon receipt, inspect the package for signs of damage. After
unpacking the Rec15/25, inspect its components thoroughly for damage incurred during shipment. If damage
is discovered, file a claim with the carrier immediately.
The inspection process is described in the table below:
Table 17
– Inspection list
#
Object
Inspection description
1
Plastic details
Absence of mechanical damages, scratches, spots
2
Silicon insulation
Absence of mechanical damages
3
Metal parts
Absence of mechanical damages, rust and spots
3.4 Unpacking
Follow the recommendation below to unpack:
Pole Mounted Recloser
3.4.1
1. Cut strapping tapes
2. Unscrew eight screws from upper collar and take it off
Содержание Rec15/25 Al1 5p
Страница 1: ......
Страница 8: ......
Страница 9: ...1 Product Description...
Страница 15: ...15 Figure 11 CPM control and indication functions...
Страница 25: ...2 Nameplates and Seals...
Страница 29: ...3 Product Handling...
Страница 42: ......
Страница 43: ...4 Installation...
Страница 57: ...5 Commissioning...
Страница 60: ......
Страница 61: ...6 Operation...
Страница 78: ...78...
Страница 79: ...7 Maintenance and Troubleshooting...
Страница 93: ...8 Disposal...
Страница 95: ...9 Appendices...
Страница 98: ...98 Appendix 2 RC5_4 Drawings Figure 97 Dimensions of RC5_4...
Страница 100: ...100 Figure 100 Dimensions of substation recloser package Figure 101 Placement of substation recloser components in a box...
Страница 102: ...102 Figure 103 Dimensions of standard OSM mounting kit arrangement for lateral installation...
Страница 103: ...103 Figure 104 Dimensions of interface bracket...
Страница 104: ...104 Figure 105 Dimensions of OSM mounting kit with M16 pole interface front installation...
Страница 105: ...105 Figure 106 Dimensions of OSM mounting kit with M16 pole interface lateral installation...
Страница 106: ...106 Figure 107 Dimensions of OSM mounting kit with M20 pole interface front installation...
Страница 107: ...107 Figure 108 Dimensions of OSM mounting kit with M20 pole interface lateral installation...
Страница 108: ...108 Figure 109 Dimensions of OSM mounting kit for installation through the pole front installation...
Страница 109: ...109 Figure 110 Dimensions of OSM mounting kit for installation through the pole lateral installation...
Страница 118: ...118 Figure 119 Dimensions of OSM substation mounting kit...
Страница 119: ...119 Figure 120 Dimensions of OSM substation mounting kit...
Страница 120: ...120 Figure 121 Dimensions of RC mounting kit for around the pole installation 500 mm U profiles 450 mm M16 threaded rods...
Страница 122: ...122 Figure 123 Dimensions of RC mounting kit for through the pole installation...
Страница 123: ...123 Figure 124 Dimensions of RC substation mounting kit...
Страница 124: ...124 Figure 125 Dimensions of VT mounting kit One VT holder...
Страница 129: ...129 Figure 134 Dimenssions of VT pole mounting kit Two VT holders two 700 mm U profiles base holder...
Страница 132: ...132 Appendix 5 RC5_4 Wiring Diagram Figure 139 RC5_4 wiring diagram...
Страница 135: ...135...
Страница 136: ......