5.1 No-load Tests
ATTENTION.
Before powering the main line, the OSM should be in the OPEN position. The OSM shall be
closed via the MMI only after the no-load tests are performed.
Powering the Protection Device
5.1.1
Switch on the battery switch. Make sure that local time and date are correct. If date, time or both are
incorrect
connect to the RC via USB, Bluetooth or TDI (see “6.5. Other RC5_4 Control Options” for details)
and synchronize date and time on your computer with the RTC of the RC using TELARM. Date and time is
visible at the MMI screen.
Date and time synchronization procedure:
TELARM->On-line->Synchronize date and time
Date and time setup via MMI:
CPM Main Menu -> Control Data -> Set Date and Time
After that the commissioning engineer should make sure that the MMI menu navigation is OK, indication on
the MMI is OK.
RC5 Power Supply Check
5.1.2
For each of the conditions described below check that MMI displays no errors and MMI LED function
(Lockout LED, Mode
– Local LED, State – Open LED, On or Off LED of each protection button, Active group
– 1 LED)
Battery switch is OFF, AC supply switch is ON;
Battery switch is ON, AC supply switch is OFF
9
;
Battery switch is ON, AC supply switch is ON.
NOTE:
Up to 60 s might be required for the RC5_4 circuits energizing.
Checking CVCS Coefficients
5.1.3
Check that the CVCS coefficients in the RC5_4 settings correspond to the RTC.
CVCS coefficient indications:
MMI -> Main menu -> Settings -> System -> Measurement
To correct coefficients, connect to the RC via TELARM:
TELARM -> On-line -> Rec -> System settings -> System -> ME settings
Change “Wires to terminal connection” setting. Check that all other System settings in TELARM are correct
for the particular device. How to upload settings is described in “6.6. Settings Modifications”.
Checking Phase Sequences
5.1.4
After powering the main line at the OSM OPEN state, the commissioning engineer should perform the
PHASE SEQUENCE check-up. The negative sequence voltage (U2) should be less than 1kV.
Negative voltage sequence indication:
MMI -> Main menu -> Indication data -> Measurement -> U2
If the negative sequence voltage is observed, it is recommended to change the software setting (changing
phase sequence System-Phase sequence).
Changing phase sequence:
TELARM -> On-line -> Rec -> System settings -> System -> Configuration -> Wires to terminal
connection
Change “Wires to terminal connection” setting. Check that all other System settings in TELARM are correct
for this particular device. How to upload the System settings is described in the “Operation” chapter.
9
If rechargeable battery is available.
Содержание Rec15/25 Al1 5p
Страница 1: ......
Страница 8: ......
Страница 9: ...1 Product Description...
Страница 15: ...15 Figure 11 CPM control and indication functions...
Страница 25: ...2 Nameplates and Seals...
Страница 29: ...3 Product Handling...
Страница 42: ......
Страница 43: ...4 Installation...
Страница 57: ...5 Commissioning...
Страница 60: ......
Страница 61: ...6 Operation...
Страница 78: ...78...
Страница 79: ...7 Maintenance and Troubleshooting...
Страница 93: ...8 Disposal...
Страница 95: ...9 Appendices...
Страница 98: ...98 Appendix 2 RC5_4 Drawings Figure 97 Dimensions of RC5_4...
Страница 100: ...100 Figure 100 Dimensions of substation recloser package Figure 101 Placement of substation recloser components in a box...
Страница 102: ...102 Figure 103 Dimensions of standard OSM mounting kit arrangement for lateral installation...
Страница 103: ...103 Figure 104 Dimensions of interface bracket...
Страница 104: ...104 Figure 105 Dimensions of OSM mounting kit with M16 pole interface front installation...
Страница 105: ...105 Figure 106 Dimensions of OSM mounting kit with M16 pole interface lateral installation...
Страница 106: ...106 Figure 107 Dimensions of OSM mounting kit with M20 pole interface front installation...
Страница 107: ...107 Figure 108 Dimensions of OSM mounting kit with M20 pole interface lateral installation...
Страница 108: ...108 Figure 109 Dimensions of OSM mounting kit for installation through the pole front installation...
Страница 109: ...109 Figure 110 Dimensions of OSM mounting kit for installation through the pole lateral installation...
Страница 118: ...118 Figure 119 Dimensions of OSM substation mounting kit...
Страница 119: ...119 Figure 120 Dimensions of OSM substation mounting kit...
Страница 120: ...120 Figure 121 Dimensions of RC mounting kit for around the pole installation 500 mm U profiles 450 mm M16 threaded rods...
Страница 122: ...122 Figure 123 Dimensions of RC mounting kit for through the pole installation...
Страница 123: ...123 Figure 124 Dimensions of RC substation mounting kit...
Страница 124: ...124 Figure 125 Dimensions of VT mounting kit One VT holder...
Страница 129: ...129 Figure 134 Dimenssions of VT pole mounting kit Two VT holders two 700 mm U profiles base holder...
Страница 132: ...132 Appendix 5 RC5_4 Wiring Diagram Figure 139 RC5_4 wiring diagram...
Страница 135: ...135...
Страница 136: ......