5. TYPICAL SYSTEM
1
Barrier cabinet
6
Photocells
2
Control panel
7
Bar rest (fixed)
3
Round section aluminium boom
Elliptical section aluminium boom
8
Metal mass sensor
4
LED strip
9
Bar gasket
5
Photocell pillar
1
2
3
3
4
4
5
6
7
8
9
6. INSTALLATION
Installation must be carried out by skilled and qualified personnel in compliance with the regulations in force.
6.1 Preliminary checks
For the safety and correct operation of the automation, check the following:
• While moving the barrier must meet no obstacle or aerial power cables.;
• The characteristics of the ground must guarantee sufficient hold for the foundation plinth;
• A suitable omnipolar circuit breaker with a distance greater than 3mm between contacts must be provided to isolate the
supply;
• There must be no pipes or electrical cables in the area where the plinth foundation is excavated;
• If the barrier is exposed to passing vehicles, provide suitable protection to avoid accidental collisions;
• Check there is an efficient earthing device to connect the cabinet;
• There must be suitable piping and tracks for electrical cables to guarantee they are not damaged.