background image

CNG

 

dispensers

 

TATSUNO

 

EUROPE

 ‐ 

Quick

 

User

 

Guide

 

,

 

revision

 

01,

 

March

 

2022

 

 

 

 

7

 

secured

 

against

 

spontaneous

 

setting

 

in

 

motion.

 

A

 

carbon

dioxide

 

extinguisher

 

or

 

dry

powder

 

extinguisher

 

with

 

a

 

filling

 

of

 

at

 

least

 

6

 

kg

 

must

 

be

 

located

 

at

 

each

 

device.

 

The

 

device

 

that

 

is

 

out

 

of

 

order

 

must

 

be

 

secured

 

against

 

its

 

misuse

 

by

 

an

 

unauthorized

 

person.

 

Device

 

design

 

safety

 

DEVICE

 

DESIGN

 

SAFETY

 

IS

 

GUARANTEED

 

BY

 

THE

 

MANUFACTURER

  

The

 

dispenser

 

design

 

meets

 

the

 

requirements

 

of

 

EN

 

ISO

 

80079

36

 

and

 

EN

 

IEC

 

60079

0

 

standards

 

and

 

is

 

designed

 

for

 

operation

 

in

 

environments

 

designated

 

by

 

symbols

 

 

II

 

2G

 

IIA

 

T3

 

stated

 

on

 

the

 

type

 

label

 

of

 

the

 

dispenser.

 

With

 

regard

 

to

 

the

 

operation

 

safety

 

in

 

the

 

potentially

 

explosive

 

environment,

 

dispenser

 

compliance

 

assessment

 

was

 

performed

 

and

 

documentation

 

archiving

 

was

 

carried

 

out

 

according

 

to

 

article

 

10,

 

par.

 

1b(2)

 

of

 

the

 

Government

 

Decree

 

No.

 

116/2016

 

Coll.

 

(article

 

13,

 

par.

 

1b(ii)

 

of

 

the

 

European

 

Parliament

 

and

 

Council

 

Directive

 

No.

 

2014/34/EU)

 

in

 

a

 

Physical

Technical

 

Testing

 

Institute

 

in

 

Ostrava

 

 

Radvanice,

 

notified

 

body

 

No.

 

1026

 

with

 

the

 

archive

 

number

 

A484

 ‐

16.

 

In

 

terms

 

of

 

pressure

 

safety,

 

EU

 

verification

 

of

 

the

 

unit

 

(Procedure

 

G)

 

was

 

performed

 

at

 

the

 

CNG

 

dispenser

 

according

 

to

 

the

 

Appendix

 

No.

 

3,

 

point

 

11

 

of

 

the

 

Government

 

Decree

 

No.

 

26/2003

 

Coll.

 

as

 

amended

 

(Appendix

 

No.

 

III,

 

point

 

10

 

of

 

the

 

European

 

Parliament

 

and

 

Council

 

Directive

 

No.

 

2014/68/EU)

 

by

 

the

 

notified

 

body

 

No.

 

1017

 

TÜV

 

SUD

 

Czech

 

s.r.o.,

 

Novodvorská

 

994,

 

142

 

21

 

Prague

 

4.

   

Operating

 

safety

 

The

 

operator

 

is

 

responsible

 

for

 

the

 

fuel

 

station

 

operation

 

and

 

is

 

obliged

 

to

 

entrust

 

its

 

operation

 

only

 

to

 

trained

 

employees

 

having

 

relevant

 

authorization.

 

The

 

task

 

of

 

the

 

attendant

 

is,

 

while

 

observing

 

all

 

safety

 

regulations,

 

competently

 

refill

 

CNG

 

pressure

 

storage

 

tanks

 

of

 

refilled

 

motor

 

vehicles

 

and

 

check

 

the

 

condition

 

of

 

dispensers,

 

reservoirs,

 

machinery

 

operation,

 

gas

 

pressure

 

and

 

keep

 

prescribed

 

operating

 

records

 

in

 

regular

 

intervals.

 

Attendant’s

 

responsibilities

 

 

Keep

 

the

 

operated

 

devices

 

in

 

a

 

safe

 

and

 

proper

 

condition.

 

 

Observe

 

operating

 

rules

 

and

 

regulations

 

and

 

operating

 

instructions

 

of

 

gas

 

devices.

 

 

Immediately

 

inform

 

the

 

operator

 

about

 

each

 

failure,

 

defect

 

or

 

abnormality

 

during

 

the

 

gas

 

device

 

operation

 

and

 

immediately

 

decommission

 

the

 

device

 

in

 

case

 

of

 

danger

 

of

 

delay.

 

 

Permanently

 

keep

 

the

 

gas

 

device

 

tidy

 

and

 

clean

 

and

 

ensure

 

that

 

no

 

unauthorized

 

persons

 

are

 

nearby

 

the

 

device.

 

 

Immediately

 

inform

 

the

 

operator

 

about

 

circumstances

 

that

 

impede

 

the

 

device

 

operation

 

for

 

the

 

attendant

 

(in

 

case

 

of

 

sudden

 

indisposition).

 

 

Write

 

down

 

the

 

records

 

into

 

the

 

operation

 

logbook

 

about

 

the

 

shift

 

start

 

and

 

finish,

 

inspections

 

performed

 

by

 

the

 

attendant

 

and

 

maintenance

 

work,

 

repairs,

 

inspections,

 

and

 

audits.

 

 

The

 

fuel

 

station

 

and

 

CNG

 

dispenser

 

attendant

 

must

 

not

 

perform

 

any

 

repairs

 

of

 

the

 

machinery

 

and

 

modify

 

the

 

settings

 

of

 

safety

 

fittings

 

on

 

his/her

 

own.

 

A

 

special

 

case

 

is

 

performing

 

service

 

interventions

 

 

A

 

service

 

worker

 

must

 

not

 

violate

 

the

 

operating

 

safety

 

during

 

repairs

 

and

 

other

 

activities.

 

He/she

 

must

 

pay

 

special

 

attention

 

to

 

removing

 

the

 

covers

 

of

 

the

 

dispenser

 

not

 

to

 

cause

 

any

 

injury

 

of

 

him

 

nor

 

a

 

casual

 

customer.

  

 

While

 

handling

 

of

 

electrical

 

components,

 

he/she

 

must

 

ensure

 

safe

 

disconnecting

 

of

 

electrical

 

energy

 

supply.

 

 

 

Only

 

approved

 

components

 

may

 

be

 

used

 

for

 

part

 

replacements.

 

All

 

parts

 

subject

 

to

 

approval

 

must

 

be

 

always

 

put

 

into

 

condition

 

which

 

is

 

prescribed

 

by

 

technical

 

documentation

 

(airtightness,

 

grounding,

 

electrostatically

 

conductive

 

delivery

 

hoses,

 

etc.).

 

Environmental

 

safety

 

The

 

CNG

 

dispenser

 

and

 

the

 

filling

 

unit

 

may

 

be

 

fitted

 

with

 

sensors

 

of

 

the

 

gas

 

leak

 

detector

 

(they

 

are

 

not

 

a

 

standard

 

part

 

of

 

the

 

dispenser

 

delivery)

 

which

 

can

 

be

 

connected

 

to

 

the

 

evaluation

 

unit.

 

In

 

case

 

of

 

gas

 

leak

 

(low

 

concentration)

 

the

 

unit

 

Содержание EUROPE

Страница 1: ...ensersUserRev01 docx Revision Date revision 01 March 2022 Number of pages 40 including cover Created by Ing Milan Berka TATSUNO EUROPE a s Pra sk 2325 68 678 01 Blansko Czech Republic tel 420 516 4284...

Страница 2: ...01 Blansko Czech Republic Tel 420 516428411 Fax 420 516428410 e mail info tatsuno europe com http www tatsuno europe com Copyright Neither the manual nor any part of it may be reproduced without the e...

Страница 3: ...HE DISPENSER 14 2 6 NAMEPLATES 15 3 INSTALLATION 16 3 1 INSTRUCTIONS FOR OCCUPATIONAL SAFETY 16 3 2 RECEIPT TRANSPORT UNPACKING 16 3 3 DISPENSER LOCATION 17 3 4 MECHANICAL ATTACHMENT OF THE DISPENSER...

Страница 4: ...0 5 9 2018 Basic version of the document Milan Berka Revision 01 31 3 2022 Update of technical data error messages dispenser settings PDEX5 Ocean Tower CNG Milan Berka 1 INTRODUCTORY INFORMATION Symbo...

Страница 5: ...the fuel station especially construction and repairs is performed fill yin compliance with this list It is the obligation of the constructor that all his employees comply with all laws directives and...

Страница 6: ...For unmanned fuel stations breakaway couplings must also be used to reduce the risk in the case of departure after the delivery nozzle has been forgotten in the vehicle tank WARNING Only qualified per...

Страница 7: ...les and checkthecondition of dispensers reservoirs machinery operation gas pressure and keep prescribed operating records in regular intervals Attendant s responsibilities Keep the operated devices in...

Страница 8: ...for private use display only the dispensed fuel quantity in kilograms NOTICE Standard painted versions of TATSUNO EUROPE dispensers are not intended for use in high humidity chemical and saltwater ar...

Страница 9: ...tic valves Two state 24VDC max 1A Data transmission of the entire contents of the display with the number of digits 7 6 5 5 is only possible using the extended communication protocol 8 8 6 2 3 DISPENS...

Страница 10: ...ispenser marking and sorting system In the case of a double sided dispenser the right side of the dispenser is also referred to as side A and the left side is referred to as side B For a one sided lef...

Страница 11: ...40x1 OEL R CNG 1 x 1 1 1 1x30 BMP40x1 OEL R CNG H 1 x 1 1 1 1x70 BMP40x2 OED CNG 2 x 2 2 2 2x30 BMP40x2 OED CNG H 2 x 2 2 2 1x30 1x70 BMP40x2 OED CNG H H 2 x 2 2 2 2x70 BMP40x2 OEL R CNG H 1 x 1 2 1 1...

Страница 12: ...1 x 1 1 1 1x30 BMP40x1 OSL R CNG H 1 x 1 1 1 1x70 BMP40x2 OSD CNG 2 x 2 2 2 2x30 BMP40x2 OSD CNG H 2 x 2 2 2 1x30 1x70 BMP40x2 OSD CNG H H 2 x 2 2 2 2x70 BMP40x2 OSL R CNG H 1 x 1 2 1 1x30 1x70 BMP40...

Страница 13: ...OWL R CNG 1 x 1 1 1 1x30 BMP40x1 OWL R CNG H 1 x 1 1 1 1x70 BMP40x2 OWD CNG 2 x 2 2 2 2x30 BMP40x2 OWD CNG H 2 x 2 2 2 1x30 1x70 BMP40x2 OWD CNG H H 2 x 2 2 2 2x70 BMP40x2 OWL R CNG H 1 x 1 2 1 1x30...

Страница 14: ...sic parts of the WSE dispensing module and its cover Position Device Position Device Position Device 1 CNG mass meter 6 CNG hose filling 11 Nozzle cover stainless without a switch 2 CNG electromagneti...

Страница 15: ...Marking of the dispenser type see section 2 3 OIML certificate Number of the OIML certificate Serial number Serial number of the dispenser seq number year of production Gas temperature range Range of...

Страница 16: ...handling and transport If the transport is ensured by the customer in another way the manufacturer shall ensure professional loading However the manufacturer is not responsible for the method of trans...

Страница 17: ...ce for dispenser installation must be structurally secured so that the possibility of dispenser damage by an incoming car and following medium leakage into atmosphere is avoided as best as possible Th...

Страница 18: ...lling the dispenser at the filling station the following must be taken into account in particular what danger zones the dispenser creates with its operation what danger zones are created by the surrou...

Страница 19: ...counters used in these dispensers are separated from other areas by a type 1 partition according to EN 13617 1 they are in an uncovered design IP54 IP55 and must therefore be located in a non explosiv...

Страница 20: ...the grounding system As a grounding wire you can use a yellow green cable with a section of at least 4 mm2 or a special grounding strap The grounding wire must be connected to a central grounding term...

Страница 21: ...nged using the remote IR infrared controller the service keypad or the pre set keypad buttons located on the dispenser The basic control unit of the dispenser is an electronic counter which is stored...

Страница 22: ...d to set the volume amount pre selection on the dispenser Unlocking the dispenser after delivery If the dispenser is in the manual mode with the blocking after delivery you can unlock the dispenser wi...

Страница 23: ...d service staff who can set a new one After entering the valid access password the display shows the value of the first parameter P00 1 Now it is possible to browse parameters by using the key or by e...

Страница 24: ...er Meaning Factory setting P03 1 product unit price hose 1 0 00 Euro kg P03 2 product unit price hose 2 0 00 Euro kg NOTENumber of fuel products shown in the P03 parameter is conditioned by the config...

Страница 25: ...g error message is displayed 4 1 10 ERROR MESSAGE CODES HISTORY P06 The function is used to display the history of the last 100 error message codes that have occurred and displayed on the dispenser Th...

Страница 26: ...ting 12 0 Automatic mode with remote control The dispenser is remotely controlled by a computer or station controller via a data line It starts fuel delivery only when an authorization command from th...

Страница 27: ...following arrangement of data on the display the first line of the display shows the temperature on the processor unit of the counter intenthsofCelsiusdegrees 26 C Thesecondlineshowsanaverageambientte...

Страница 28: ...ns of all installed technical devices Do not allowpersonswithoutappropriateprofessionalqualificationtotampertheinstalledtechnology includingthegasdevices CAUTION It is forbidden to smoke and use open...

Страница 29: ...service remote controller to enter the counter service mode R password Setting parameter P97 to 1 activates the zero point setting function The counter sends a command to set the zero point to the mas...

Страница 30: ...serious deficiencies he she is entitled to refuse storage tank filling In case of gas leak or danger the attendant shall finish the delivery The operation of the dispenser itself is ensured by the em...

Страница 31: ...tion Immediately inform the operator about each defect failure or abnormality during operation Immediately decommission the device in case of gas leak or danger Keep tidiness and cleanliness and ensur...

Страница 32: ...control deliveries from the fuel station booth The booth contains a control device by which the fuel station attendant releases the dispenser for delivery and collects information about the delivered...

Страница 33: ...down that ensure safe deceleration of fuel flow rate before the target preset value a Example of entering the pre selection in Euros The customer arrives to the dispenser and wants to deliver fuel for...

Страница 34: ...to the counter memory and will be shown after the power supply is connected again see the previous section Now the dispenser is out of order 6 MAINTENANCE AND SERVICE 6 1 MAIN PRINCIPLES OF DISPENSER...

Страница 35: ...nter season when due to the activity of aerosols from chloride agents created from salts used for road maintenance the paint of unprotected body parts may be permanently damaged or inter crystal corro...

Страница 36: ...the circuit breaker for the single phase power supply 230V of the dispenser in the main switchboard of the fuel station If the dispenser is connected to the control computer the dispenser blocking may...

Страница 37: ...munication Controlling computer not connected or communication cable not connected correctly E20 NFAT Power failure during delivery Check the dispenser power supply If the fault persists call an autho...

Страница 38: ...witchboard the valves on the supply line must be fully closed during service work vehicles must be prevented from passing within 5 meters around a fire extinguisher must be available to workers servic...

Страница 39: ...CNG dispensers TATSUNO EUROPE Quick User Guide revision 01 March 2022 39 6 3 3 EU DECLARATION OF CONFORMITY...

Страница 40: ...TATSUNO EUROPE a s www tatsuno europe com 40 NOTES...

Отзывы: