Tarter VALUE 90 SWEEP TUB 90ST Скачать руководство пользователя страница 1

STEP ONE

SETUP INSTRUCTIONS

VALUE 90 SWEEP TUB

90ST

STEP TWO

STEP FOUR

Place radius bar on the ground in the desired location. 
Note: The end of the radius bar with the larger peg will be 
the end on which the sweep gate will hinge.

STEP THREE

Ensure tubing on sweep gate arch has not been 
compromised during shipping. Remove any “dimples” 
that may keep tube from sleeving over peg.

Slide the sweep gate arch (which contains the sweep gate) 
over the larger peg on the radius bar.

**Remove the attachment rods from 
hinge side of sweep gate arch and 
set aside for later use.

STEP FIVE

Attach one of the curved panels to the sweep gate arch.

**Attachment rods are to be used to attach a squeeze chute, palpation cage, or additional alley panels.

STEP SIX

Slide the second curved panel over the small peg on the radius bar and attach it to the 1st curved panel.

Отзывы: