Tanaka ACR-M3 Скачать руководство пользователя страница 1

 
 
 
 
 
 
 

Micro Carbon Residue Tester 

 

Model ACR-M3 

 
 

Instruction Manual 

 

Rev.2.10 100421 

 
 
 
 
 
 
 
 

 
 

IMPORTANT: 
*This Manual contains important technical 
  information as wall as safety information. 
*Read this Manual thoroughly before use, and
  keep it for later use. 

 
 

TANAKA SCIENTIFIC LIMITED 

 

Содержание ACR-M3

Страница 1: ...del ACR M3 Instruction Manual Rev 2 10 100421 IMPORTANT This Manual contains important technical information as wall as safety information Read this Manual thoroughly before use and keep it for later...

Страница 2: ...aration of Test Sample 8 4 4 Processing of Samples 9 4 5 Final Weighing 10 4 6 Calculation 10 5 Replacing Parts Making Self Diagnosis and Maintenance 11 5 1 Parts and Consumables 11 5 2 Periodical Ins...

Страница 3: ...se who operate ACR M3 Also it is assumed that the user have knowledge of handling of dangerous goods as well as related industrial standards such as ASTM REVISIONS The contents of this Manual may be s...

Страница 4: ...e of This Tester for Other Purposes Use this Tester solely for its intended use of performing determination of Carbon Residue subscribed in such test standards as ISO 10370 ASTM D4530 and IP 398 Cauti...

Страница 5: ...4 1 Overview of Model ACR M3 Fig 1 External View of Model ACR M3 MAIN Switch Used for turning the power ON OFF...

Страница 6: ...rest in order to start another test quickly Do not place a hot lid on the rest when the cooling fan is not running Exhaust Outlet Exhausts N2 gas and uncondensible vapor Coking Oven Heats samples unde...

Страница 7: ...trogen Gas Connection Connect the nitrogen gas inlet to a nitrogen gas supply 1st Stage Regulator or piping with the supplied braided hose Then fasten both ends with wire bands The suitable hose nippl...

Страница 8: ...operly fastened No trap along the hose 5 Condensate trap Not full of condensate 6 Electric Power supply Prongs properly plugged Grounding properly connected 7 Display unit Turn the MAIN Switch on temp...

Страница 9: ...djust it accordingly with N2 needle valve for 150ml min 0 15L min by flow meter 4 3 Preparation of Test Sample Measure the sample into a sample vial There are three kinds of sample vials large small a...

Страница 10: ...ter this the temperature 1 and flow rate of nitrogen are controlled as indicated in Fig 2 To complete the temperature and flow program 2 in 98 minutes 5 The buzzer intermittently sounds for about 10 s...

Страница 11: ...to the nearest 0 1mg and record Handle the vials with forceps 4 6 Calculation Perform appropriate calculations with weights found residue is the weight of final vial minus clean vial weight divided b...

Страница 12: ...ts Name 010 01 003 010 01 005 010 00 007 ACR 02 001 ACR 02 002 ACR 02 003 ACR 03 001 ACR 02 401 ACR 02 402 ACR 02 015 ACR 02 413 260 02 002 Small Vials 100 box Medium Vials 50 box Large Vials 50 box H...

Страница 13: ...ved carry out the cleaning procedure at once Smoke leaking from the seal Not much condensate producing in the trap Condensate found around the seal 5 2 1 Inspection Procedure Tab 4 Inspection Procedur...

Страница 14: ...to disassemble the lid Assembly See Fig 4 1 Hold the lid assembly upside down and disengage the retainer ring using the tip of a small screw driver 2 Remove the plug insulator sub assembly and loosen...

Страница 15: ...ler needs to be replaced Consult Distributor RESET switch ON Low N2 gas pressure N2 gas bomb pressure is low N2 gas line pressure is low Replace N2 gas bomb Adjust N2 gas line pressure How to remove t...

Страница 16: ...the secondary pressure less than 80kPa Flow Meter 0 1 to 1L min Flow Rate Automatically regulated at 150ml min and 600ml min according to ASTM D4530 Inlet 10mm hose nipple 7 Condensate Trap 200ml vin...

Страница 17: ...ories Medium Vials 100 box Test for ISO 10370 Holder for Mixed Vials small medium 6 and Large 3 Auxiliary Cooling Fan Unit To help cooling the oven quickly 1st Stage Regulator for nitrogen gas bomb mo...

Отзывы: