Set the frame.
2-5
2
2.
Tubular goods frame
[Setting procedure]
1.
Loosen the screw (1) to adjust the position of the fabric stretching arm (2) so that the tubular goods frame gauge fits to the
size of fabric.
2.
Place the outer frame (4) on the tubular goods frame gauge (3) and lay the fabric (sweat shirt in this example) over the frame
gauge.
Place interlining cloth on the outer frame (4) according to need.
3.
Fit the inner frame (5) into the outer frame (4).
At this time, check if the fabric has no shrinkage and is evenly stretched.
It is possible to adjust fitting degree by using the screw (6).
4.
Set the tubular goods frame to the tubular goods frame sash, and push the tubular goods frame to the position (section A)
where the tubular goods frame arm (7) is locked.
Check if there is no step nor gap at section B.
When there is a step or gap: p.3-5
The shape of the tubular goods frame arm differs depending on type of frame.
1
2
3
4
5
1
1
2
6
1
7
7
7
A
B
KY02
Содержание TEJT II -C
Страница 2: ......
Страница 26: ...1 22 Changing procedure of the frame ...
Страница 27: ...2 Set the frame 1 Cap frame p 2 2 2 Tubular goods frame p 2 5 ...
Страница 32: ...2 6 Set the frame ...