TB9100/P25 CG Installation and Operation Manual
Replacing Modules
81
© Tait Electronics Limited January 2007
3.
Insert the securing screw into the floating nut
i
in the subrack and
tighten. Note that you may have to push the screw in and down to
pick up the floating nut.
4.
Carry out the instructions in
Configuring the Control Panel Board
A link (J300) is provided on the control panel board which allows you to
select the color displayed by the seven channel LEDs (refer to the examples
below). This link selects the color for all the channel LEDs.
Note
The following diagram shows the bottom side of the board (as
seen with the board mounted in the control panel chassis). J300 is
mounted on the top side of the board, and is accessible from the
top of the control panel assembly.
Examples of LED
Colors
Example 1
With the following link settings:
■
Subrack interconnect board links set for Rx gate status signal (see
“Configuring the Subrack Interconnect Board” on page 94
■
control panel board link across pins 1 and 2
J300
pin 1
J300
Содержание P25 CG
Страница 60: ...60 Installation TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 72: ...72 Maintenance TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 76: ...76 Troubleshooting TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 120: ...120 Technical Description TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...
Страница 146: ...146 TaitNet P25 Glossary TB9100 P25 CG Installation and Operation Manual Tait Electronics Limited January 2007 ...