7.2
Handing over the fresh water station to the operator
Personnel:
n
Operator
n
Heating and sanitary technician
Material:
n
Operating instructions for the fresh hot
water station
These operating instructions for the fresh hot water
station and the other applicable documents should
be kept in the immediate vicinity of the fresh hot
water station.
1.
Hand over the operating instructions for the fresh hot water
station to the operator.
2.
Copy the parameters set into a separate commissioning report
().
3.
Instruct the operator on how the fresh hot water station func-
tions, and its individual components.
4.
Instruct the operator about the regulation and setting options.
5.
Make the operator aware that the fresh hot water station
cannot function correctly when the controller is not correctly
set. Point out that only one heating technician should set the
parameters for the fresh hot water station.
6.
Point out the yearly maintenance intervals to the operator.
TACOTHERM FRESH PETA 2 / PETA 2 X
Commissioning
V02.2020 11/2020
Item no. 215747
EA no. 1329
Operating instructions
42