background image

12 34

ZONE 1

12 34

ZONE 2

12 34

ZONE 3

12 34

ZONE 4

PRIORITY

ZONE

2 WIRE

ZONE VALVE

(NO END SWITCH)
MUST USE JUMPER

TACO

3 WIRE

ZONE VALVE 

1
2
3

JUMPER

3 & 4

MOTOR

END

SWITCH

4 WIRE

ZONE VALVE

(POWER OPEN,
SELF CLOSING)

JUMPER

3 & 4

POWER

CONTROLS

SEE NOTE

ZVC 404-EXP-4

FOUR ZONE EXPANDABLE

ZONE VALVE CONTROL

 24 VAC

 FACTORY

INSTALLED

TRANSFORMER

 120 VAC

INPUT

WHITE

BLACK

POWER IN

24 VAC 

 24 VAC

 FACTORY

INSTALLED

TRANSFORMER

 120 VAC

INPUT

WHITE

BLACK

TO

CIRCULATOR

DRY

CONTACTS

N/O COM N/C

PUMP END

SWITCH

ZONE 4 PUMP

END SWITCH

SLAVE

PRIORITY ON

RESET

POST PURGE ON

PRIORITY PROTECTION ON

PUMP EXERCISE ON

30 SEC/2 WK

MASTER
OFF
NORMAL
OFF
OFF
OFF
4 MIN/24 HOUR

NOTE:

 When a circulator is used

on the priority zone instead of a
zone valve, jumper 3 and 4 of
the priority zone.

THERMOSTATS (24 VAC)

INDIRECT
WATER HEATER
AQUASTAT OR
THERMOSTAT

T STAT 1

VALVE 1

T STAT 2

VALVE 2

T STAT 3

VALVE 3

T STAT 4

VALVE 4

POWER

LED

INDICATORS

TO:  "TT" ON BOILER

TO:  "TT" ON BOILER WITH
       DHW "TT" INPUT

ZONE 1 

 

ZONE 2  ZONE 3  ZONE 4 NET

EXPANSION

MAIN

PRIORITY

XX XX

AB CR W C RW C RW CR W C 12

END SWITCH

THERMOSTATS (24 VAC) PRIORITY

24 VAC ZONE VALVES

ACCESSORY

PORT

PRIORITY

XX

FUSE

5 AMP

FUSE

5 AMP

Powered from Transformer 

A

Powered from Transformer 

B

A

B

Powered from Transformer 

A

Powered from Transformer 

B

Operation/External Diagnostics:

When any thermostat calls for heat,

the appropriate zone valve is energized and the yellow light goes on.
When the zone valve is fully open, the red light goes on and energizes
the end switch relay. The green light should always be on, indicating
that power is connected.

Priority Operation:

When the priority dip switch is set to ON and the

priority zone is actuated, all other zones will stop operation until pri-
ority zone is satisfied. When not switched to priority, all zones will
operate independently.

Mode Operation:

When the dip switch is set to NORMAL, the end

switch relay will be energized if any zone is in operation. When the switch
is set to RESET, the end switch relay will only be energized if the priority
zone is in operation, or through the operation of a plug-in reset control.

Post Purge Operation:

When the dip switch is set to ON, the priori-

ty zone output will stay energized for 2 minutes after its thermostat or
aquastat is satisfied, but not operate the boiler.

Priority Protection Operation:

When the dip switch is set to ON, and

if the priority zone calls continuously for more than one hour, power
is returned to all the other zones, allowing each zone to function inde-
pendently. Once the priority zone is satisfied, the control's auto-reset is
activated and the priority zone is again allowed to have priority for up
to one hour starting from when it calls next.  

Pump Exercise Operation:

When the dip switch is set to ON, the solid

state timer cycles all the zone valves and circulating pumps that are
attached to the Expandable Zone Valve Control at the selected time
interval. The time interval can be set for the valves and pumps to run
for either 30 seconds every 2 weeks or for 4 minutes every 24 hours.

End Switches (Dry Contacts):

The main end switch closes when any

zone thermostat calls for heat and the mode switch is set to NORMAL.
The main end switch also closes when the mode switch is set to RESET
and a PC Series boiler reset power control is calling for heat. The priori-
ty end switch closes only when the priority zone thermostat or aquastat
is calling for heat.

Expansion Connections: 

Set the expansion switch to MASTER on the

switching relay that has the designated priority zone or is utilizing the
PC Series plug-in option. Set all other daisy chained controls to SLAVE.
Using thermostat wire (18-22 gauge) connect between terminals A, B,
C on the master control to the corresponding A, B, C on the SLAVE con-
trol(s). Controls may be daisy chained up to 20 zoning panels using any
combination of -EXP controls (120 zones if all are 6 zone panels).

Thermostat Input (24 vac):

R

Hot side of transformer. Connect to 

R

on thermostat.

W

Switched 

signal from thermostat. Connect to 

on 

thermostat.

C

Common side of transformer. Connect to 

COM

on 

thermostat (optional).

NET

Network terminals 1 & 2 are tied together for wiring convenience
when using communicating style thermostats (optional).

Power Input (120 vac):

Connect neutral (white) leads on transformers to 120 volts ac
neutral power supply.
Connect hot (black) leads on transformers to 120 volts ac
hot power supply.

Pump End Switch (Dry Contacts):

Connect hot power supply to the right side of the pump end switch
terminal on board.
Connect hot input lead of the circulator to the left side of the pump
end switch terminal on board.

Zone 4 Pump End Switches (Dry Contacts): 

See Diagram.

N/O

Normally open terminal of the priority zone relay.

COM

Common terminal of the priority zone relay.

N/C

Normally closed terminal of the priority zone relay.

End Switch Pump Neutral Connections:

Connect neutral power supply directly to neutral lead on circulator(s).

WARNING: 

Wiring connections must be made in accordance with all

applicable electrical codes. Use copper wire only. 120 VAC wiring must have
a minimum temperature rating of 75°C. Failure to follow this instruction
can result in personal injury or death and/or property damage. 12-18 gauge
wire recommended for 120 VAC connections, 14-22 gauge wire for thermo-
stat connections, and 14-22 gauge wire for 24 VAC source connections.

Wiring Diagram

Instruction Sheet

ZVC404-EXP-4 Zone Valve Control

102-399

SUPERSEDES: New

EFFECTIVE: May 1, 2010

Plant ID# 9300-2880

This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that
may cause undesired operation.

N/O COM N/C

PUMP END

SWITCH

ZONE 4 PUMP

END SWITCH

XX

DHW

PUMP

SYSTEM PUMP AND BOILER TURN ON WHEN ANY ZONE VALVE OPENS.
DHW PUMP TURNS ON 

ONLY

 WHEN PRIORITY ZONE CALLS.

SECONDARY PUMP COMES ON WHEN ANY ZONE CALLS 

EXCEPT

 PRIORITY ZONE.

SYSTEM

PUMP

SECONDARY

PUMP

120

VAC

HOT

NEUTRAL

Optional System
and/or DHW and/or
Secondary Circulators

Specifications:

PRODUCT

NUMBER

INPUT

MAX 24 VAC

TYPE 1 ENCLOSURE

NUMBER

OF ZONES

VOLTAGE

OUTPUT @ 25°C

WIDTH HEIGHT

DEPTH

ZVC404-EXP-4

4 with Priority

120/60/1 VAC, 3A

24 VA per Zone

12

1

4

"

8"

3"

40 VA per Transformer

The pump end switches are rated 

1

6

hp, 5 amps at 120 VAC. The main and priority end switch connections

are rated 24 VAC, 1 amp. All thermostat and zone valve connections supply a 24 VAC class 2 output.