2
Configuring
the
Instrument
Performance Checks
2-3
When using test fixtures, keep the lid closed while power is applied
to the device under test. Carefully read the Safety Precautions
instructions that are supplied with your test fixtures.
Before performing any maintenance, disconnect the line cord and
all test cables. Only qualified service personnel should perform
maintenance.
Performance
Checks
The instrument has been inspected for mechanical and electrical
performance before shipment from the factory. It is free of physical
defects and in perfect electrical order. Check the instrument for
damage in transit and perform the electrical procedures outlined in
the section entitled
Unpacking and Initial Inspection.
Power
Requirements
The function generator may be operated from a wide range of
mains voltage 85 to 265 Vac. Voltage selection is automatic and
does not require switch setting. The instrument operates over the
power mains frequency range of 48 to 63Hz. Always verify that the
operating power mains voltage is the same as that specified on the
rear panel.
The 2074 should be operated from a power source with its neutral
at or near ground (earth potential). The instrument is not intended
for operation from two phases of a multi-phase ac system or across
the legs of a single-phase, three-wire ac power system. Crest factor
(ratio of peak voltage to rms.) should be typically within the range of
1.3 to 1.6 at 10% of the nominal rms. mains voltage.
Grounding
Requirements
To ensure the safety of operating personnel, the U.S. O.S.H.A.
(Occupational Safety and Health) requirement and good
engineering practice mandate that the instrument panel and
enclosure be “earth” grounded. Although BNC housings are
isolated from the front panel, the metal part is connected to earth
ground.
WARNING
Do not attempt to float the output from ground as it may
damage the Model 2074 and your equipment.
Содержание 5064
Страница 26: ...1 5 Figure 1 2 ArbConnection The Control Panels Figure 1 3 ArbConnection The Wave Composer...
Страница 71: ...2074 User Manual 2 18 This page intentionally left blank...
Страница 145: ...2074 User Manual 3 74 Figure 3 48 Reading the 2074 Internal Temperature...
Страница 207: ...2074 User Manual 4 62 Figure 4 47 Complete Pulse Train Design Figure 4 48 Section 5 of the Pulse Train Design...
Страница 220: ...4 ArbConnection Logging SCPI Commands 4 75 Figure 4 58 Log File Example...
Страница 221: ...2074 User Manual 4 76 This page was intentionally left blank...
Страница 333: ...2074 User Manual 7 2...
Страница 358: ...7 Adjustments and Firmware Update Updating 2074 Firmware 7 27 Figure 7 9 Firmware Update Completed...
Страница 359: ...2074 User Manual 7 28 This page was intentionally left blank...
Страница 360: ...Appendices Appendix Title Page A Specifications A 1 1...
Страница 361: ...2074 User Manual 2...