2074
User Manual
6-22
Test Results
Pass
Fail
3. Remove the cable from channel 1 and repeat the test on
channels 2, 3, and 4, using the appropriate sync output
connection on the rear panel for each channel
Test Results
Pass
Fail
SYNC Position
Equipment: Oscilloscope
Preparation:
1. Configure the oscilloscope as follows:
Time Base:
As required by the test
Amplitude:
2 V/div
2. Connect the 2074 CH1 output to the oscilloscope input (1)
3. Connect 2074 SYNC output CH1 to the oscilloscope input (2)
4. Configure model 2074 as follows:
Ch1 Output:
On
Test Procedure:
1. Verify trace on the oscilloscope shows synchronization pulses at
1
μ
s intervals. Verify that the synchronization pulse coincides
with the start of the waveform
2. Modify the SYNC Position parameters and observe that the
synchronization pulse position moves in reference to the
channel 1 output
Test Results
Pass
Fail
3. Remove the cable from channel 1 and repeat the test on
channels 2, 3, and 4, using the appropriate sync output
connection on the rear panel for each channel
Test Results
Pass
Fail
Содержание 5064
Страница 26: ...1 5 Figure 1 2 ArbConnection The Control Panels Figure 1 3 ArbConnection The Wave Composer...
Страница 71: ...2074 User Manual 2 18 This page intentionally left blank...
Страница 145: ...2074 User Manual 3 74 Figure 3 48 Reading the 2074 Internal Temperature...
Страница 207: ...2074 User Manual 4 62 Figure 4 47 Complete Pulse Train Design Figure 4 48 Section 5 of the Pulse Train Design...
Страница 220: ...4 ArbConnection Logging SCPI Commands 4 75 Figure 4 58 Log File Example...
Страница 221: ...2074 User Manual 4 76 This page was intentionally left blank...
Страница 333: ...2074 User Manual 7 2...
Страница 358: ...7 Adjustments and Firmware Update Updating 2074 Firmware 7 27 Figure 7 9 Firmware Update Completed...
Страница 359: ...2074 User Manual 7 28 This page was intentionally left blank...
Страница 360: ...Appendices Appendix Title Page A Specifications A 1 1...
Страница 361: ...2074 User Manual 2...