ARES-G2 Getting Started Guide
Page 38
Chapter: 2
Installing the ARES-G2
Unpacking/Repacking the ARES-G2
Instructions for unpacking and repacking the instrument are found as separate unpacking instructions in the
shipping box and in the instrument control software online documentation. You may wish to retain all of
the shipping hardware, the pallet, and boxes from the instrument in the event you wish to repack and ship
your instrument.
Preparing the System
Before shipment, the ARES-G2 instrument is inspected both electrically and mechanically so that it is
ready for operation upon proper installation. Only limited instructions are given in this manual; consult
TRIOS online documentation for additional information. Installation involves the following procedures:
•
Inspecting the system for shipping damage and missing parts.
•
Choosing a suitable location.
•
Connecting the ARES-G2 to a suitable air supply.
•
Connecting all cables and lines.
•
Connecting the ARES-G2 to the power supply.
•
Connecting the ARES-G2 to the controller computer and network.
It is recommended that you have your ARES-G
2
unpacked and installed by a TA Instruments Ser-
vice Representative. Call for an installation appointment upon receiving your instrument.
CAUTION: To avoid mistakes, read this entire chapter before you begin installation.
MISE EN GARDE: Pour éviter de commettre des erreurs, lisez tout le chapitre avant de commencer
l'installation.
WARNING: Have an assistant help you unpack this unit. Do not attempt to do this
alone.
AVERTISSEMENT: Faites-vous aider par une personne pour dépoter cet appareil.
N'essayez pas de le faire tout seul.