2 Warnings

The following admonitions will be presented in the different sections of the document.

Danger

• Make sure that the Mains supply to the unit is disconnected before performing any maintenance or

electrical work!

• All electrical connections must be carried out by an authorized installer and in accordance with

local rules and regulations.

• Operation in the refrigerant circuit and handling refrigerants must be performed by certified personnel.

Warning

• The door handles are only intended to be used during the installation. These must be removed before

the unit is put into operation to ensure the required level of safety for the unit.

• The unit is heavy. Be careful during transport and mounting. Risk of injury through pinching. Use

protective clothing.

• Beware of sharp edges during mounting and maintenance. Make sure that a proper lifting device is

used. Use protective clothing.

• Skin contact with the refrigerant must be avoided. Use protective equipment such as protective

goggles, gloves and suitable clothing’s. Good ventilation must be arranged.

• If freezing injury a doctor must be seen.

• If skin contact the exposed part of the body must be carefully washed.

• If eye contact use eye wash or lukewarm water and wash for 20 minutes, visit a doctor.

• The units electrical connection to the mains supply must be preceded by an all pole circuit breaker

with a minimum 3 mm gap.

Caution

• If the unit is installed in a cold place make sure that all joints are covered with insulation, and tape well

• Duct connections/duct ends should be covered during storage and installation

• Do not connect tumble dryers to the ventilation system

3 Refrigerant Control/Reporting

Topvex SoftCooler TR comes pre-filled with refrigerants and belongs to the group "Piece units containing
more than 3kg refrigerants per circuit". Before commissioning shall always a control report in respect of the
installation be established by a cooling certified person. Leakage control with record keeping shall be done
once per year. The installation of the Topvex SoftCooler TR is only duty to report if the property/enterprise
where the installation occurs, all together after installation, has a total amount of refrigerants of 10 kg or
more ("small Piece units" with refrigerants less than 3 kg, e.g. normal refrigerators/freezers does not
includes). Reporting shall in occurring cases be done to major inspection authority (normally the municipal
environmental office).

Different regulations can be valid in different countries. Check with your local government.

Topvex SoftCooler TR09-15

Installation instructions

208767

2

Systemair Sverige AB

Содержание Topvex SoftCooler TR Series

Страница 1: ...Topvex SoftCooler TR09 15 Installation instructions Document in original language 208767 EN_GB 15 03 2016 A004...

Страница 2: ...here how to install 7 6 3 Installing the unit 8 6 3 1 Installation 8 6 3 2 Installation procedure 10 6 4 Dividing the Topvex TR air handling unit 11 6 4 1 Assembly the Topvex SoftCooler 12 6 4 2 Elect...

Страница 3: ...inery Safety distances to prevent hazard zones being reached by upper or lower limbs EN 60204 1 Safety of machinery Electrical equipment of machines Part 1 General requirements EN 60335 1 Household an...

Страница 4: ...arm water and wash for 20 minutes visit a doctor The units electrical connection to the mains supply must be preceded by an all pole circuit breaker with a minimum 3 mm gap Caution If the unit is inst...

Страница 5: ...ic information and recommendations concerning the design installation start up and operation to ensure a proper fail free operation of the unit The key to proper and safe operating of the unit is to r...

Страница 6: ...105 210 700 TR12 2770 1740 1230 930 965 76 104 104 105 215 800 TR15 2820 1980 1470 1180 965 76 104 104 105 236 1000 Model M N O P Q R S Weight kg Total Weight kg1 TR09 300 190 1030 870 840 550 120 26...

Страница 7: ...hand connected units Position Description 1 Compressor 2 Condenser coil 3 Evaporator coil 4 Filter drier with sight glass 5 Expansion valve 6 Drip tray with drain 7 Water seal 8 Cable grommet for exte...

Страница 8: ...rminal block mains supply 2 Circuit breaker MCB oil heaters 3 Relays 4 Terminal block internal external connections 5 Frequency converter with display 6 DC Choke 7 Transformer 24 V 8 Display Topvex So...

Страница 9: ...or indoor installation Place the unit on a horizontal flat surface It s important that the unit is completely levelled before it is put into operation The electronic components should not be exposed t...

Страница 10: ...t Position Description Supply air Exhaust air Outdoor air Extract air 1 VAV Pressure transmitters accessory 2 Damper and motor outdoor air accessory 3 Damper and motor exhaust air accessory 4 Locked c...

Страница 11: ...door air Extract air 1 Exhaust air By pass 2 VAV Pressure transmitters accessory 3 Damper and motor outdoor air accessory 4 Damper and motor exhaust air accessory 5 Damper and motor exhaust air by pas...

Страница 12: ...aker safety switch which is enclosed inside the unit on delivery The wiring between the safety switch and the unit is led through the top of the unit casing directly to the electrical connection box S...

Страница 13: ...plit the unit Remove the heat exchanger extract fan and the extract air filter A Remove the plate B Loose the cable connectors C Remove the 7 M10 screws that join the two halves of the appliance Fig 6...

Страница 14: ...ex SoftCooler have been joined together with the two air handling unit parts it is in total 5 duct connections on top of the unit Outdoor air Supply air Extract air and 2 Exhaust air Duct connections...

Страница 15: ...ing The unit is not to be taken into operation before the included condensation drain and water seal are connected from the Topvex SoftCooler to the floor drain The drain is to be connected to the dra...

Страница 16: ...ee also the chapter Internal electrical connections 3 Move the Exhaust air temp sensor EHS located at the extract air filter from its place to the new place by the label EHS in the SoftCooler Fig 10 E...

Страница 17: ...tion Remark G G 24V AC 4 DI ref Referens 10 DO ref Referens 12 DO Exhaust air damper A signal from control unit E28 is lead via the relay R2 to terminal 28 for controlling of the by pass damper access...

Страница 18: ...Description EF Extract air fan SF Supply air fan SS Temp sensor supply air OS Temp sensor outdoor air ETS Temp sensor extract air EHS Temp sensor exhaust air UC Controller E28 RC Rotor control RM Rot...

Страница 19: ...3 Power control The compressor CPR are step less controlled between in the frequency converter FC set minimum and maximum frequency 7 4 Power limitation The frequency converter FC is continuously sens...

Страница 20: ...nected via the Safety switch see chapter 6 4 2 Electrical connection By pass damper connected when such is to be used accessory see chapter 6 4 2 1 External Internal connections Internal operating cab...

Страница 21: ...on the compressor the oil in the compressor crankcase must be heated before the first start Moment Done Note Stop the Supply and extract fan via the Topvex air handling units safety switch Turn on the...

Страница 22: ...or running Read the below values via the display of the frequency converter see section Frequency converter quick guide in Operating and Maintenance Instructions First set the parameter for reading th...

Страница 23: ...Topvex SoftCooler TR09 15 Installation instructions 208767 21 Systemair Sverige AB...

Страница 24: ...erves the right to make changes and improvements to the contents of this manual without prior notice Systemair Sverige AB Industriv gen 3 SE 739 30 Skinnskatteberg Sweden Phone 46 222 440 00 Fax 46 22...

Отзывы: