9
Follow the ventilation drawing when connecting the unit to the duct system.
6.1
Ventilation Duct Connection and Insulation
Important
• Always cover the ventilation ducts during construction period.
• Make sure there are no loose objects or impurities inside the ducts.
Install the ducts, supply air diffusers and air intake grilles as shown in the ventilation drawing.
• Supply air and extract air ducts must be insulated if located in cold places.
• Outdoor air and exhaust air ducts with cold air must be insulated if located in warm places (inside building’s vapour
barrier).
It is very important to insulate cold ducts and joints tightly without any gaps, otherwise there is a risk of condensation
which may result in moisture damage.
Do not install the ducts directly against structural building elements to avoid sound propagation. Use acoustic insulation
and sound attenuators.
Note:
The type of ventilation ducts and insulation differ for each building and climate zone. If the ventilation
drawing is not provided, please contact your installer or place of purchase for recommendations.
6.2
Installation and Configuration of Accessories
Please follow instructions included with the accessory or consult “Service and Accessories Installation” manual which
can be found in our online catalogue.
7
Electrical connections
The SAVE VTR 250/B is wired internally from factory.
The electrical connection box can be found on the supply air outlet side of the unit. The print card can easily be taken
out from the unit, without using tools.
7.1
Main circuit board layout
The SAVE VTR 250/B is equipped with built-in regulation and internal wiring.
254496 | v01
Содержание SAVE VTR 250/B
Страница 1: ...Document in original language 254496 v01 SAVE VTR 250 B Installation instructions GB...
Страница 4: ......
Страница 7: ...Technical Data 3 3 1 Dimensions and Weight Fig 2 Dimensions of left hand unit 254496 v01...
Страница 19: ...254496 v01...