STYLITIS-10 INSTALLATION GUIDE [0516]
35
17.
OPEN COLLECTOR SENSORS (ENERGY METERS)
1-Phase Energy meters: Revalco’s 1RCEM1, 1RCEM2, 1RCEM263, etc.
3-Phase Energy meters: ABB’s ODIN4165, Revalco’s 1RCETM63, etc.
CONNECTION:
Connect the first sensor’s open collector output to screws 1 [CH1] (+) and
2 [GND] (-) on the left screw terminal.
Connect the second sensor’s open collector output to screws 6 [CH8] (+)
and 5 [GND] (-) on the right screw terminal.
Wire polarity does matter. See the diagrams on the side of each sensor.
Below, you can see connection examples of a 1-phase sensor and a 3-
phase one.
1-PHASE EXAMPLE (1RCEM1) 3-PHASE EXAMPLE (1RCETM63)
SETUP:
Connect serially via Opton 4. (Connect the
computer’s COM port to the datalogger’s
PERIPHERAL port).
Before changing the setup select:
ACQ OFF
.
After changing setup select:
ACQ ON
to start acquisition (data logging).