097-58001-02 Revision G – April 2008
TimeProvider User’s Guide
75
Chapter 3 Installing the TimeProvider
Making Connections
6. Mount the antenna and mast assembly to the “L” bracket using the supplied nuts,
bolts, and washers, as shown in
Figure 3-23
.
Figure 3-23. Attaching the Antenna to the Bracket
7. Using a plumb line or bubble level, ensure the antenna is within 5° of vertical
(perpendicular to the horizon), and tighten the mounting bracket bolts.
8. Bolt the lightning suppressor mounting plate to a flange that is attached to a valid
earth ground. The roof ring ground system, a Central Office grounding plate, and
building structural steel are examples of valid earth ground points. If the
mounting plate cannot be bolted to a valid earth ground, bolt the mounting plate
to a point within 15 feet (4.6 m) of the chosen valid earth ground. If the mounting
plate is to be installed in a nonmetallic junction box, perform the installation and
bolt the assembly near the chosen valid earth ground.
Содержание EDGE CLOCK 1000
Страница 1: ...TimeProvider 1000 and 1100 Edge Clock User s Guide Revision G April 2008 Part Number 097 58001 02 ...
Страница 10: ...Table of Contents 10 TimeProvider User s Guide 097 58001 02 Revision G April 2008 ...
Страница 154: ...Chapter 5 Testing the TimeProvider Test Record 154 TimeProvider User s Guide 097 58001 02 Revision G April 2008 ...
Страница 224: ...Index Y Y 224 TimeProvider User s Guide 097 58001 02 Revision G April 2008 ...