![Symmetricom 5071A Скачать руководство пользователя страница 158](http://html.mh-extra.com/html/symmetricom/5071a/5071a_operating-and-programming-manual_1419614158.webp)
Chapter 7 Installation
Internal Standby Battery Maintenance
130
Operating and Programming Manual
Battery Charging
Lead-acid batteries are designed for occasional usage and long periods
of continual trickle charging currents. Unlike Nickel-cadmium
batteries, they are not designed for continual deep discharge/charge
usage. This makes lead-acid the ideal choice for typical constant
operating installations of the 5071A. They will last much longer in a
full-charge state and provide more reliable capacity when they are
needed.
Because of the long-term storage design of lead-acid batteries, we do
not recommend that the 5071A internal batteries be used in situations
where power is removed on a daily basis. If this is your situation, the
internal batteries will be constantly subjected to discharge and
possibly not receive the necessary full 16 hours of re-charge during
each typical workday. Such repeated partial charge and discharge
cycles can permanently damage the lead-acid battery storage capacity.
If you need to operate the 5071A under these conditions, it is
recommended that one of the two following processes be used to
ensure that the batteries not be stressed by over-use and under-
charging.
• Either press the BATTERY DISCONNECT switch on the rear panel each
time the power is turned off, or
• Disconnect the battery wires (inside the rear door) to completely remove
them from use.
Refer to page 28 of this manual for instructions on how to disconnect
the batteries.
The rechargeable lead-acid batteries in the 5071A are charged only
when the instrument is connected to the ac mains. The typical
charging time between a fully discharged state and fully charged state
is approximately 16 hours. Shorter charging periods will reduce the
operating time you can expect from a single battery charge.
Charging occurs automatically when ac power is connected to the
5071A. The battery is either boost- or trickle-charged depending upon
the terminal voltage read by the charging circuit. The charger
automatically switches from one state to another as it monitors the
battery terminal voltage.
Charging the battery pack(s) outside the instrument with an external
charger is not recommended.
The 5071A’s charging circuit is designed
specifically for lead-acid batteries and incorporates temperature-
compensated threshold levels to determine the point at which
charging rates switch from boost to trickle. These threshold levels are
critical to the long-term performance and reliability of the internal
battery packs.
Содержание 5071A
Страница 2: ......
Страница 28: ...Preface xxvi Operating and Programming Manual ...
Страница 29: ...____________________________________________ Chapter 1 Getting Started Getting Started ...
Страница 32: ...Chapter 1 Getting Started The 5071A at a Glance 4 Operating and Programming Manual ...
Страница 33: ...Chapter 1 Getting Started The 5071A at a Glance Operating and Programming Manual 5 ...
Страница 34: ...Chapter 1 Getting Started The 5071A at a Glance 6 Operating and Programming Manual 48V OPTION REAR PANEL VIEW ...
Страница 40: ...Chapter 1 Getting Started Performing Basic Tasks 12 Operating and Programming Manual ...
Страница 41: ...____________________________________________ Chapter 2 Using the 5071A Using the 5071A ...
Страница 57: ...____________________________________________ Chapter 3 In Case of Difficulty In Case of Difficulty ...
Страница 97: ...____________________________________________ Chapter 5 Command Reference Command Reference ...
Страница 119: ...Chapter 5 Command Reference Description of SCPI Commands Operating and Programming Manual 91 ...
Страница 136: ...Chapter 5 Command Reference Error Messages Codes 108 Operating and Programming Manual ...
Страница 137: ...____________________________________________ Chapter 6 Specifications Specifications ...
Страница 145: ...____________________________________________ Chapter 7 Installation Installation ...
Страница 162: ...Chapter 7 Installation Cesium Beam Tube Replacement 134 Operating and Programming Manual ...
Страница 163: ...____________________________________________ Appendix A Performance Tests Performance Tests Verifying Specifications ...
Страница 186: ...Appendix A Performance Tests 5071A PERFORMANCE TEST 158 Operating and Programming Manual ...
Страница 187: ...____________________________________________ Appendix B Glossary Glossary ...
Страница 190: ...Appendix B Glossary 5071A Glossary 162 Operating and Programming Manual ...