3-1
Chapter 3
Batch and Spectrum One Terminal Setup
Introduction
Before using a Series 6800 terminal, perform the following procedures:
t
Install the battery (refer to
Chapter 6, Maintaining the Series 68XX
t
Charge the battery (refer to
Chapter 6, Maintaining the Series 68XX
t
Load the system files and application(s).
Programs are stored in the terminal’s nonvolatile memory (NVM), also called the application
EEPROM.
Hardware Requirements
The following equipment is required to initialize a batch or a Spectrum One radio terminal:
t
6800 or 6810 terminal
t
One or more 38/6860 or 38/6865 cradles, or 38/6866 CCM
OR
t
PC adapter with Printer Interface Module (PIM)
t
A straight-through RS-232 null modem cable with male DB-25 connector at one end
and female DB-25 connector at the other end
t
Power Supply
t
Host Computer
Содержание Series 6800
Страница 2: ...Series 6800 Product Reference Guide 70 32645 01 Revision A April 1998...
Страница 9: ...viii Series 6800 Product Reference Guide...
Страница 79: ...5 16 Series 68XX Product Reference Guide...
Страница 89: ...6 10 Series 68XX Product Reference Guide...
Страница 101: ...7 12 Series 68XX Product Reference Guide...
Страница 105: ...B 2 Series 68XX Product Reference Guide...
Страница 108: ...C 3 Specifications Scanning Decode Zones Standard...
Страница 109: ...C 4 Series 68XX Product Reference Guide...
Страница 111: ...D 2 Series 68XX Product Reference Guide...
Страница 137: ...Index 6 Series 68XX Product Reference Guide 38 6860 CCM 2 10 38 6866 2 6 warm boot D 1 warm start D 1...
Страница 138: ...70 32645 01 Revision A April 1998 Symbol Technologies Inc One Symbol Plaza Holtsville N Y 11742...