Starting instructions
Page 30/40
Installation and starting instruction manual
SYCLOPE TRACE’O
®
VIII.
Commissioning
You just finished to connect all the wires for measurements, actuators and communication equipments
and now, you are ready for commissioning the controller.
The commissioning consists to set basic values for controlling actuators and to proceed to the water
treatments. To ensure you are right, please check:
Environmental settings (Real time, contrast, language, communication…)
Setting points of all parameters
Calibrations of the sensors
Programing of the threshold alarms
►
Power on the controller.
►
Check that all systems are correct, that your central unit has switched on and that the
other elements of your installation are not disrupted.
The
SYCLOPE TRACE’O
®
regulator does not automatically begin treatment and dosing of
chemical products when switched on. Only the user can control when to begin treatment
having checked that the central unit has been correctly programmed according to his/her
needs.
When switching on, the measured parameters predefined by the basic configuration are displayed and
the processes are inactives.
As soon as you switch on the controller, a “
TRACE’O
” screen appears, followed by the main screen
displaying the measured parameters.
1)
Choosing the language
_
>> MAIN MENU <<
_
Langue/Sprache/Taal
French
English
German
Spanish
Italian
Portuguese
_
>> MAIN MENU <<
_
User menus
Langue/Sprache/Taal
Setting real time
Services
* TRACEO V1.00 *
Sn: xxxxxxxxx
_
>> MAIN MENU <<
_
User menus
Langue/Sprache/Taal
Setting real time
Services
* TRACEO V1.00 *
Sn: xxxxxxxxx
m3/h
K: - - - - 14:44
->.<- : 1.00 ->.<- : 7.40 ->.<- : 0.0
1.05
Cl
pH
7.86 1.8