16
PB 9210 Assembly Instructions
Swing Beam Drill Locations
1. Step 1:
Tap t-nut into 3/8’’ hole as shown in
(Fig. 7)
.
2. Step 2:
Place a bottom beam clamp over the swing hanger as shown in
(Fig. 7)
.
3. Step 3:
Insert the swing hanger into the beam and thread it into the T-nut until it is flush or near flush with the
top of the T-nut. A screwdriver may be used to twist the hanger
(Fig. 7)
. Orient swing hanger as shown
in
(Fig 7)
.
4. Step 4:
Use (4) 1-1/4'' screws to secure beam clamp.
5.
Check hanger to ensure it does not spin.
6.
Repeat for all swing hangers.
(4) 1-1/4'' screws
Swing Hanger
Use Screwdriver to aid in tightening
Bottom Beam Clamp
t-nut
Hammer
3/8'' hole
T-nut
Fig. 7
Содержание PB 9210
Страница 32: ... PlayCore Inc 2010 Printed In USA LA 6240 Questions Call our Customer Service Department at 1 800 888 1232 ...
Страница 66: ...34 Instrucciones de ensamblaje para PB 9210 Instructions d assemblage PB 9210 ...
Страница 67: ...35 Instrucciones de ensamblaje para PB 9210 Instructions d assemblage PB 9210 ...