Swatch SWISS TIMING 3454.041 Скачать руководство пользователя страница 11

 

Swimming Starting Block / OSB12 

 

Version 1.4 

3454.507.02 

Page 7 

4.4  Service 

Once a month: 

clean  the  starting  platform  with  soft  water  and  remove  the  outside 
sediments of oxidation. 

Every 6 months: 

check cable connections. 

Once a year: 

check rigidity of platform and footrest fixation. 

4.5  Troubleshooting (detection of a short circuit) 

If the buzzer emits a sound while there is no pressure on the platform, proceed as follows:  
 

Unscrew the 4 nuts M8 on the platform (1). 

Remove platform (1) and connect the buzzer to the connection cable. 

Insert a screwdriver into the 2 holes of the lower frame and unscrew each of the adjustment 
screws until they do not touch the contact head any more.  

If the sound continues, verify if there is a short circuit on the cable or between the fixed and mobile 
frame (mechanical or electrical connection).  

4.6  Troubleshooting (no contact) 

If the buzzer does not emit a sound during the sensitivity adjustment, proceed as follows:  
 

Make  sure  that  the  platform  and  the  RBD  are  correctly  assembled,  there  must  be  a  visible 
movement.  

Make sure that the 2 adjustment screws are not too far apart. 

4.7  Sensitivity adjustment 

If  the  sensitivity  is  out  of  the  range  of  13kg  and  18kg  (as  indicated  in  paragraph  4.2),  make  an 
adjustment by proceeding as follows:  

Remove platform and connect the buzzer. 

Insert  a  screwdriver  in  one  of  the  holes  of  the  lower  frame  (4)  then  screw  the  adjustment 
screw (6), facet after facet of the hexagonal head until the buzzer emits a sound. 

Unscrew the adjustment screw by turning it 4 facets backwards (0,16mm/facet). 

Adjust the second screw in the same way. 

Make a test with the Dynamometer (2) by pushing or pulling the upper frame. 

If  the  measured  pressure  is  higher  than  18kg,  continue  screwing  the  screw  in  and  test  at 
every facet). 

If pressure is lower than 13kg, unscrew and test at every facet). 

Reassemble platform (1) and the 4 nuts and washers M8.  

It is recommended to proceed systematically with the adjustment to obtain a regular play between 
the 2 contacts.  

Содержание SWISS TIMING 3454.041

Страница 1: ...3454 507 02 Version 1 4 Edition March 2020 OSB 12 Swimming Starting Block User s Manual...

Страница 2: ...to refuse all guarantees if this condition is not fulfilled If the installation includes a horn be sure to maintain a sufficient security distance from the public Documentation Updates Swiss Timing L...

Страница 3: ...r the platform 3 2 INSTALLATION 4 2 1 Fixation of the OSB12 platform 4 3 TECHNICAL CHARACTERISTICS OF THE OSB12 SW WITH RELAY BREAK DETECTION RBD AND WITHOUT START CONTROL 5 4 CONTROL AND MAINTENANCE...

Страница 4: ......

Страница 5: ...aken by top level swimmers showed faster races versus a standard block OSB12 starting blocks have been tested by world class swimmers who have helped to specify the optimum angles of both the platform...

Страница 6: ...ting platform Relay Break Detection 1 3454 041 OSB12 Platform 2 3454 600 RBD Relay Break Detection 3 3393 024 Intermediate plate 1 2 Construction of the OSB12 starting platform simple 1 3454 041 OSB12...

Страница 7: ...n 1 4 3454 507 02 Page 3 1 3 Fixation material for the platform 1 3454 018 Drilling gauge 2 9051 9806 Drill 8 3 9039 8579 Pegs M6 x 15 6x 4 9582 1504 Stainless steel washer M6 6x 5 9507 1566 Hexagon h...

Страница 8: ...Page 4 3454 507 02 Version 1 4 2 INSTALLATION 2 1 Fixation of the OSB12 platform...

Страница 9: ...THOUT START CONTROL OSB12 RBD OSB12 Simple DIMENSIONS Plateform 740mm x 520mm x 38mm 165mm with footrest WEIGHT KG 21 2 19 5 COLOURS Platform white RAL 9010 with non skidding surface dark blue RAL 500...

Страница 10: ...er emits a sound proceed as described in paragraph 4 5 4 2 Pressure sensitivity control Press with the Dynamometer 2 against the middle of the platform 1 Read on the Dynamometer 2 the pressure necessa...

Страница 11: ...ng the sensitivity adjustment proceed as follows Make sure that the platform and the RBD are correctly assembled there must be a visible movement Make sure that the 2 adjustment screws are not too far...

Страница 12: ...8 Dismantling of the footrest Instruction for dismantling the footrest Unscrew the platform by removing the 6 screws located on the platform Position the footrest on number 3 to access the screws bet...

Страница 13: ...4 3454 507 02 Page 9 Rotate the top to access the lateral screws Unscrew the 4 screws 2 on each side Pull to remove the footrest then remove the guides To reassemble the footrest start from this poin...

Страница 14: ...e degree of contamination of the stainless steel You must pay extra attention to the RBD Relay Break Detection and the handles backstroke ledge Concerning dismantling it is imperative to use tools tha...

Страница 15: ...You must use fresh water for cleaning Never use abrasive material to clean the stainless steel parts Drying the stainless steel parts must be done using a clean dry cloth Use specially dedicated stai...

Страница 16: ...ince last version 1 0 05 11 09 Initial version 1 1 20 02 14 Addition of chapter 5 Prevention and Maintenance 1 2 24 04 14 Correction action force chapter 3 4 2 and 4 7 1 3 26 06 14 Improvement of prev...

Страница 17: ...Swimming Starting Block OSB12 Version 1 4 3454 507 02 Page 13 NOTES...

Страница 18: ......

Страница 19: ...P O Box 138 rue de l Envers 1 Phone 41 32 488 36 11 2606 Corg mont www swisstiming com Switzerland info swisstiming com SWISS TIMING LTD SWISS TIMING LTD...

Отзывы: