Section III: Operation
3.0.OPE.SL-214
PLACING A CONTAINER ON THE GROUND:
STEP 1.
MOVE THE SLIDING JIB ALL THE WAY BACK (RIGHT CONTROL BACKWARD) UNTIL MECHANICAL JIB
LATCHES UNLOCK.
STEP 2.
TILT THE ARM BACKWARDS (LEFT CONTROL BACKWARD). WHEN THE CONTAINER TOUCHES THE
GROUND, RELEASE THE BRAKES TO FREE THE TRUCK FOR FORWARD MOVEMENT CAUSED BY THE
CONTAINER.
STEP 3.
ROTATE JIB ALL THE WAY BACK UNTIL THE CONTAINER TOUCHES THE GROUND. PULL AWAY FROM
CONTAINER AND ROTATE JIB BACK INTO THE TRANSPORT POSITION.
WARNING:
1. DON'T OVER SPEED THE PUMP 1,500 RPM
MAXIMUM.
2. DON'T DUMP, MOUNT OR DISMOUNT BODIES
ON UNEVEN GROUND.
3.
DON'T DRIVE WITH THE HOIST IN THE DUMP
POSITION OR WITH THE HOOK TILTED BACK.
3-3
Содержание SL-214
Страница 1: ...Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 214...
Страница 2: ......
Страница 30: ...This Page Intentionally Left Blank...
Страница 40: ...This Page Intentionally Left Blank...
Страница 46: ...This Page Intentionally Left Blank...
Страница 51: ...Section II Installation Accessories 2 8 INS ACC LEDLB 2 39...
Страница 52: ...This Page Intentionally Left Blank...
Страница 56: ...This Page Intentionally Left Blank...
Страница 64: ...This Page Intentionally Left Blank...
Страница 68: ...Section IV Maintenance 4 0 MAI SL 214 LUBRICATION DIAGRAM LEGEND GW Grease Weekly GM Grease Monthly 4 2...
Страница 78: ...This Page Intentionally Left Blank...
Страница 90: ...This Page Intentionally Left Blank...
Страница 105: ......
Страница 106: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000...