
AMI Powercon
Maintenance
A-96.250.341 / 061015
57
If QA-Check is not successful it is recommended to clean the sen-
sor, see
Maintenance of the Sensor, p. 44
. If QA-Check fails again
contact your local SWAN distributor for support.
6.8.5
Completion of the measurement
1
Stop the sample flow to the AMI Powercon by closing the appro-
priate valve, e.g. back pressure regulator, sample preparation
or flow regulating valve at flow cell again.
2
Close flow regulating valve of the AMI Inspector.
3
Disconnect the AMI Inspector by removing the tubes and con-
nect the sample outlet of the Monitor AMI Powercon to the sam-
ple outlet funnel again.
4
Start sample flow again and regulate sample flow.
5
Shutdown AMI INSPECTOR Conductivity.
For longer stop of operation see manual of AMI INSPECTOR Con-
ductivity