A-96.250.451 / 190121
AMI Deltacon Power
Installation
17
3.
Installation
3.1. Installation Checklist Monitors
On-site
requirements
AC variant: 100–240 VAC (±10%), 50/60 Hz (±5%)
DC variant: 10–36 VDC
Power consumption: 35 VA maximum
Protective earth connection required
Sample line with sufficient sample flow and pressure (see
Instrument Specification, p. 14
).
Installation
Mount the instrument in vertical position.
Display should be at eye level.
Connect sample inlet and outlet.
Monitor: Sensors are already mounted.
Single flow cell: Mount sensors (see
), and connect cables (see
).
Electrical Wiring
Connect all external devices like limit switches, current loops and
pumps (see
).
Connect power cord; do not switch on power yet!
Cation
exchanger
Fill up cation exchanger bottle with high purity water. Remove the
empty bottle and install the cation exchanger bottle.
With pre-rinse set-up, install a cation exchanger bottle to the
second flange.
Power-up
Open sample flow and wait until flow cell is completely filled.
The cation exchanger bottle is deaerated automatically.
Switch on power. Adjust sample flow.
Instrument
set-up
Program all sensor parameters (see
).
If required activate calculations (see
).
Program all parameters for external devices (interface, recorders,
etc.).
Program all parameters for instrument operation (limits, alarms).
Program display screens.
Run-in period
Let the instrument run continuously for 1 h. This is valid for rinsed
cation exchanger resin (nuclear grade) delivered by Swan.
If you do not use rinsed cation exchanger resin, the run-in period
may be much longer.