AMI Codes-II CC
Installation
A-96.250.581 / 220616
19
3.
Installation
3.1.
Installation Check List
Check
Instrument’s specification must conform to the National Electrical
Code, all state and local codes, and all plant codes and standards
for electrical equipment.
On site require-
ments
100–240 VAC (
10%), 50/60 Hz (
5%) or 24 VDC (±10%),
isolated power outlet with ground connection and 30 VA.
Sample line with min. 10 l/h and 0.15–2 bar.
Waste line with pressure free drain.
Installation
Mount the instrument in vertical position.
Display should be at eye-level.
Mount the filter, filter vessel, and constant head cover. Connect the
sample and waste line. See
Connecting Sample and Waste, p. 21
Electrical Wiring
Do not switch on the Instrument until all electrical connections are
made.
Connect all external devices like limit switches, current loops and
pumps.
Connect power cord.
See
If ordered:
Option pH
See
Reagents
Prepare reagents. See
Refill or replace Reagents, p. 46
Insert the suction lances combined with level detector.
Power-up
Perform exactly in this order:
Lock pump tubes.
Turn on the sample flow and wait until the flow cell is completely
filled.
Switch on power.
Start <Fill system>. See
Fill or Flush Reagent System, p. 38
Instrument
Setup
Program all parameters for external devices (interface, recorders,
etc.). Program all parameters for instrument operation (limits,
alarms, measuring interval).
Run-in period
Let the instrument run continuously for 1 h.
pH sensor
calibration
If ordered: Calibrate pH sensor. See