3.6. Install the AMI Sample Sequencer
If more than two sample streams are required, an AMI Sample
Sequencer can be connected to the AMI Sodium P, which allows to
measure up to six sample streams. The electrical connection is de
-
scribed in the manual of the AMI Sample Sequencer.
3.6.1
Sample connection with 2
nd
sample stream
If an AMI Sample Sequencer is connected to an AMI Silica with a
second sample stream option [A], sample inlet 2 will be automatically
switched off and only sample inlet 1 will be active.
Connect the sample outlet of the Sample Sequencer to sample
inlet 1 [E] of the second sample stream option.