14
A-96.250.501 / 280915
AMI Hydrazine
Installation
3.
Installation
3.1.
Installation Checklist Monitors
Check
Instrument’s specification must conform to the National Electri-
cal Code, all state and local codes, and all plant codes and stan-
dards for electrical equipment.
On site require-
ments
100–240 VAC (
10%), 50/60 Hz (
5%) or 24 VDC (±10%),
isolated power outlet with ground connection and 30 VA.
Sample line with sufficient sample flow and pressure (see
Installation
Mounting of Instrument Panel, p. 15
Connecting Sample and Waste, p. 15
Electrodes
Install the Reference Electrode, p. 16
Install the Temperature Sensor, p. 17
.
Diisopropyl-
amine
Install the Diisopropylamine Bottle, p. 28
.
Electrical wir-
ing
Note:
Do not switch on the Instrument until all electrical
connections are made.
Connect all external devices like limit switches, current loops
and pumps, see
Power-up
Switch on power.
Adjust sample flow according to flow cell specifications.
Instrument
set-up
Program all necessary parameters see
.
Program all parameters for external devices (interface,
recorders, etc.).
Program all parameters for instrument operation (limits,
alarms).
Run-in period
Let the instrument run-in for approximately 30 min continuous
operation. See
.