ENGINE COOLING (M13 ENGINE) 6B2-11
Thermostat Removal and Installation
Removal
1) Drain coolant referring to “Cooling System Draining” in this
section.
2) Remove intake manifold referring to “Intake Manifold
Removal and Installation” in Section 6A2.
3) Remove generator referring to “Generator Dismounting and
Remounting” in Section 6H.
4) Disconnect water hose (1) and heater hose (2) from each
pipe.
5) Remove thermostat case (3) with thermostat cap (4) and
water inlet pipe (5).
6) Remove water inlet pipe (5) with thermostat cap (4) from
thermostat case.
7) Remove thermostat.
Installation
Reverse removal procedure for installation noting the following
points.
• When positioning thermostat (1) on thermostat case (2), be
sure to position it so that jiggle valve (3) comes at position as
shown in figure.
• Use new O-rings when installing.
• Adjust water pump belt tension referring to “Water Pump/
Generator Drive Belt Tension Inspection and Adjustment” in
this section.
• Adjust A/C compressor belt tension (if equipped) referring to
“Compressor Drive Belt Inspection and Adjustment” in Sec-
tion 1B.
• Refill cooling system referring to step 7) to 22) of “Cooling
System Flush and Refill” in this section.
• Verify that there is no coolant leakage at each connection.
Thermostat Inspection
• Make sure that jiggle valve (1) of thermostat is clean.
Should this valve be clogged, engine would tend to overheat.
• Check to make sure that valve seat (2) is free from foreign
matters which would prevent valve from seating tight.
• Check thermostat seal (3) for breakage, deterioration or any
other damage.
Содержание Wagon R Plus RB310
Страница 3: ......
Страница 5: ......
Страница 57: ...0B 24 MAINTENANCE AND LUBRICATION...
Страница 65: ...1B 8 AIR CONDITIONING OPTIONAL...
Страница 91: ...3D 16 FRONT SUSPENSION...
Страница 141: ...4A 20 FRONT DRIVE SHAFT G10 M13 ENGINES...
Страница 153: ...5 6 BRAKES...
Страница 163: ...5B 6 FRONT BRAKE...
Страница 290: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS M13 ENGINE 6 2 115 A Fig 1 for Step 3 B Fig 3 for Step 8 C Fig 2 for Step 7...
Страница 294: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS M13 ENGINE 6 2 119 A Fig 1 for Step 3 B Fig 3 for Step 8 C Fig 2 for Step 7...
Страница 308: ...ENGINE GENERAL INFORMATION AND DIAGNOSIS M13 ENGINE 6 2 133 A Fig 1 for Step 5 B Fig 2 for Step 9...
Страница 418: ...ENGINE MECHANICAL M13 ENGINE 6A2 79 Main Bearings Crankshaft and Cylinder Block Components...
Страница 435: ...6A2 96 ENGINE MECHANICAL M13 ENGINE...
Страница 457: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM M13 ENGINE Engine and Emission Control System Flow Diagram...
Страница 519: ...6H 4 CHARGING SYSTEM G10 M13 ENGINES...
Страница 539: ...7A2 16 MANUAL TRANSAXLE M13 ENGINE Transaxle Case Components...
Страница 553: ...7A2 30 MANUAL TRANSAXLE M13 ENGINE Input Counter Shaft Components...
Страница 576: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 7 Table of Component Operation...
Страница 690: ...AUTOMATIC TRANSAXLE M13 ENGINE 7B1 121...
Страница 789: ...7C 14 CLUTCH G10 M13 ENGINES...
Страница 797: ...7D 8 TRANSFER...
Страница 821: ...8B 4 LIGHTING SYSTEM...
Страница 827: ...8C 6 INSTRUMENTATION DRIVER INFORMATION...
Страница 839: ...8G 12 IMMOBILIZER CONTROL SYSTEM G10 M13 ENGINES...
Страница 845: ...9 6 BODY SERVICE...
Страница 846: ...Prepared by 1st Ed August 2003 Printed in Japan 844...