Manual Transmission: 5B-13
Installation
Install the gear position switch in the reverse order of
removal. Pay attention to the following points:
• Apply grease to the O-ring.
CAUTION
!
Replace the O-ring with a new one.
NOTE
Align the gear position switch pin “A” with
the gearshift cam hole “B”.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
• Tighten the gear position switch bolts (1) to the
specified torque.
Tightening torque
GP switch mounting bolt (a): 6.5 N·m (0.65 kgf-m,
4.5 lb-ft)
• Route the gear position switch lead wire. Refer to
“Wiring Harness Routing Diagram in Section 9A
(Page 9A-7)”.
NOTE
Be sure that the grommet (2) is set to the
crankcase.
• Install the clutch cover. Refer to “Clutch Installation in
Gearshift Lever Construction
B822H15206009
“A”
“B”
I822H1520041-01
(a)
1
I822H1520043-02
1. Gearshift lever
“A”: Footrest top surface
2. Gearshift link arm
“a”: 115 – 125 mm (4.5 – 4.9 in)
3. Gearshift link rod
: 50 N
⋅
m (5.0 kgf-m, 36.0 lb-ft)
4. Gearshift lever bolt
: Apply grease.
5. Wave washer
2
I822H1520044-02
“ a ”
1
3
2
“A”
5
(a)
4
I822H1520045-06
Содержание VLR1800
Страница 4: ......
Страница 64: ...0C 12 Service Data...
Страница 456: ...2D 22 Wheels and Tires...
Страница 489: ...Drive Chain Drive Train Drive Shaft 3A 31 09951 17010 Bearing installer Page 3A 19...
Страница 490: ...3A 32 Drive Chain Drive Train Drive Shaft...
Страница 580: ...6B 11 Steering Handlebar...
Страница 623: ...Prepared by January 2008 Part No 99500 39360 01E Printed in Japan 624...