
FUEL SYSTEM AND THROTTLE BODY 5-15
THROTTLE BODY REASSEMBLY
Reassemble the throttle body in the reverse order of disassem-
bly. Pay attention to the following points:
• With the secondary throttle valve fully opened, install the STP
sensor
1
and tighten the STP sensor mounting screw to the
specified torque.
NOTE:
* Apply thin coat of engine oil to the O-ring.
* Align the secondary throttle shaft end
A
with the groove
B
of
STP sensor.
* Apply grease to the secondary throttle shaft end
A
if neces-
sary.
99000-25010: SUZUKI SUPER GREASE “A”
or equivalent
STP sensor mounting screw:
3.5 N·m (0.35 kgf-m, 2.5 lbf-ft)
09930-11950: Torx wrench (5 mm)
NOTE:
* Make sure the secondary throttle valve smoothly open and
close.
* If the STP sensor adjustment is necessary, refer to page 5-18
for STP sensor setting procedure.
• With the throttle valve fully closed, install the TP sensor
2
and tighten the TP sensor mounting screw to the specified
torque.
NOTE:
* Apply thin coat of engine oil to the O-ring.
* Align the throttle shaft end
C
with the groove
D
of TP sensor.
* Apply grease to the throttle shaft end
C
if necessary.
99000-25010: SUZUKI SUPER GREASE “A”
or equivalent
TP sensor mounting screw:
3.5 N·m (0.35 kgf-m, 2.5 lbf-ft)
09930-11950: Torx wrench (5 mm)
NOTE:
* Make sure the throttle valve smoothly open and close.
After installed TP sensor, adjust the TP sensor and
perform the TP learned value reset with SDS tool.
(
4-40, -69)
Содержание TU250X
Страница 1: ......
Страница 2: ......
Страница 41: ...PERIODIC MAINTENANCE 2 23...
Страница 213: ...EXHAUST SYSTEM 6 1 6 EXHAUST SYSTEM CONTENTS EXHAUST SYSTEM 6 2 REMOVAL 6 2 INSPECTION 6 4 INSTALLATION 6 4...
Страница 342: ...10 22 SERVICING INFORMATION SIDE STAND INSTALLATION 50 N m 5 0 kgf m 36 0 lbf ft 55 N m 5 5 kgf m 40 0 lbf ft...
Страница 369: ......
Страница 370: ......