PERIODIC MAINTENANCE 2-25
VALVE CLEARANCE
• Remove the seat. (
5-2)
• Remove the radiator covers and fuel tank. (
13-2, -3)
• Remove the spark plug. (
2-7)
• Remove the cylinder head cover
2
and gasket
3
by remov-
ing their bolts
1
.
The valve clearance specification is different for both intake and
exhaust valves.
Valve clearance adjustment must be checked and adjusted: 1)
at the time of periodic maintenance, 2) when the valve mecha-
nism is serviced, and 3) when the camshafts are removed for
servicing.
NOTE:
* The piston must be at top dead center (TDC) on the compres-
sion stroke in order to check or adjust the valve clearance.
* The valve clearance should only be checked when the engine
is cold.
• Drain engine oil. (
2-13)
• Remove the TDC plug
4
and crankshaft
hole plug
5
.
• Place a wrench over the crankshaft and turn it counter-clock-
wise to align the TDC mark
A
with the center of the groove
B
of the timing inspection hole.
• Insert the thickness gauge between the tappet and cam. If the
clearance is out of specification, adjust it to specification as
follows.
09900-20803: Thickness gauge
Valve clearance (when cold):
Standard: IN. : 0.09 – 0.16 mm (0.004 – 0.006 in)
EX. : 0.17 – 0.24 mm (0.007 – 0.009 in)
Содержание RM-Z250
Страница 1: ......
Страница 56: ...2 40 PERIODIC MAINTENANCE...
Страница 177: ...11 2 LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM CHART CAM CHAIN...
Страница 401: ...SERVICING INFORMATION 20 29 BRAKE PEDAL SET UP 1 Rear master cylinder 3 Brake pedal 2 Return spring a 0 10 0 0 4 in...
Страница 408: ...20 36 SERVICING INFORMATION FRONT FENDER INSTALLATION REAR FENDER INSTALLATION 1 Front fender 1 Seat rail 2 Rear fender...
Страница 410: ...Prepared by September 2009 Part No 99500 42190 01E Printed in Japan 420...
Страница 411: ......