KICK STARTER 6-5
• Install the clutch. (
!
5-7)
• Fit a new gasket and install the crankcase cover.
#
Crankcase cover bolt: 11 N·m (1.1 kgf-m, 8.0 lb-ft)
• Install the kick starter lever with the punched mark on the
lever aligned with the punched mark on the kick starter shaft.
#
Kick starter lever bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
• Install the rear brake pedal. (
!
3-6)
INSPECTION AFTER REASSEMBLY
After reinstalling the kick starter assembly, inspect the follow-
ings.
• Transmission oil level (
!
2-9)
• Engine coolant level (
!
2-11)
Содержание RM 250 2003
Страница 1: ...OWNER S SERVICE MANUAL...
Страница 61: ...6 2 KICK STARTER CONSTRUCTION 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Страница 85: ...9 2 FUEL SYSTEM CONSTRUCTION 4 5 N m 0 45 kgf m 3 25 lb ft...
Страница 100: ...10 2 COOLING SYSTEM CONSTRUCTION 5 5 N m 0 55 kgf m 4 0 lb ft 10 N m 1 0 kgf m 7 0 lb ft...
Страница 117: ...12 2 CONSTRUCTIONS EXTERIOR PARTS Seat Bolt Washer Frame Frame cover Seat rail 5 N m 0 5 kgf m 3 5 lb ft...
Страница 198: ...18 TROUBLESHOOTING 18 1 CONTENTS TROUBLESHOOTING TROUBLESHOOTING 18 2 ENGINE 18 2 CHASSIS 18 5...