3-6 ENGINE DISMOUNTING AND MOUNTING
Install the parts in the reverse order of removal. Pay attention to
the following points:
• Tighten the brake pedal pivot bolt
1
.
#
Brake pedal pivot bolt: 29 N·m (2.9 kgf-m, 21.0 lb-ft)
• Reassemble the drive chain clip so that the slit end faces
opposit to the direction of rotation.
• Install a new exhaust pipe gasket.
• Apply a small quantity of transmission oil to the O-ring before
installing the exhaust pipe.
• Fit the projection of the carburetor to the depression of the
intake pipe.
INSPECTION AFTER ENGINE MOUNTING
After mounting the engine, inspect the followings.
• Transmission oil level (
!
2-9)
• Engine coolant level (
!
2-11)
• Clutch cable play (
!
2-13)
• Throttle cable play (
!
2-13)
• Drive chain slack (
!
2-16)
• Brake pedal height (
!
2-20)
• Wire, cable and hose routing (
!
19-12 to 15)
CAUTION
Replace the cotter pins with new ones.
Direction of travel
Содержание RM 250 2003
Страница 1: ...OWNER S SERVICE MANUAL...
Страница 61: ...6 2 KICK STARTER CONSTRUCTION 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Страница 85: ...9 2 FUEL SYSTEM CONSTRUCTION 4 5 N m 0 45 kgf m 3 25 lb ft...
Страница 100: ...10 2 COOLING SYSTEM CONSTRUCTION 5 5 N m 0 55 kgf m 4 0 lb ft 10 N m 1 0 kgf m 7 0 lb ft...
Страница 117: ...12 2 CONSTRUCTIONS EXTERIOR PARTS Seat Bolt Washer Frame Frame cover Seat rail 5 N m 0 5 kgf m 3 5 lb ft...
Страница 198: ...18 TROUBLESHOOTING 18 1 CONTENTS TROUBLESHOOTING TROUBLESHOOTING 18 2 ENGINE 18 2 CHASSIS 18 5...