![Suzuki LT-A400 Скачать руководство пользователя страница 499](http://html.mh-extra.com/html/suzuki/lt-a400/lt-a400_service-manual_1408824499.webp)
Body Structure: 9E-6
Installation
Install the front grip bar in the reverse order of removal.
Pay attention to the following point:
• Tighten the front grip bar mounting bolts to the
specified torque.
Tightening torque
Front grip bar mounting bolt (a): 28 N·m (2.8 kgf-
m, 20.0 lb-ft)
Trailer Towing Removal and Instruction
B827H19506010
Removal
Remove the trailer towing (1) by removing the bolts.
Installation
Apply thread lock to the rear axle housing mounting bolts
and tighten them to the specified torque.
: Thread lock cement 99000–32030 (THREAD
LOCK CEMENT SUPER 1303 or equivalent)
Tightening torque
Rear axle housing mounting bolt (final gear case)
(a): 55 N·m (5.5 kgf-m, 40.0 lb-ft)
(a)
(a)
I827H1950015-02
(a)
I827H1950016-02
1
I827H1950017-01
(a)
(a)
I827H1950018-01
Содержание LT-A400
Страница 1: ...Printed in Japan K8 9 9 5 0 0 4 3 0 7 0 0 1 E K8 ...
Страница 4: ......
Страница 66: ...0C 14 Service Data ...
Страница 165: ...Engine Lubrication System 1E 18 09930 40113 Rotor holder Page 1E 7 Page 1E 8 ...
Страница 227: ...Charging System 1J 15 09930 31921 09930 44541 Rotor remover Rotor holder Page 1J 6 Page 1J 6 Page 1J 7 ...
Страница 232: ...1K 5 Exhaust System ...
Страница 258: ...2D 6 Wheels and Tires ...
Страница 356: ...3D 24 Propeller Shafts ...
Страница 396: ...4D 4 Parking Brake ...
Страница 464: ...6B 13 Steering Handlebar ...
Страница 501: ...Prepared by December 2007 Part No 99500 43070 01E Printed in Japan 504 ...
Страница 502: ...Printed in Japan K8 9 9 5 0 0 4 3 0 7 0 0 1 E K8 ...