background image

If you purchased an Anchor Kit with your shelter or if you’re using the ropes and 

spikes supplied by Surf and Turf, connect your rope or strap around the top joint of 

the leg as seen above and secure. Then, connect the other end around the metal 

peg. Hammer the peg into the ground at an angle and then pull the rope tight.

You can follow this process to add addition weights such as a bucket of sand.

Our Instant Shelters are robust and designed to be used in most weather  

conditions. With that being said, it is important that you assess the conditions on 

the day. If the conditions get too severe you may need to take the shelter down to  

eliminate any risk of damage. 

It is your responsibility that the structure is safe!

Содержание CANOPRO LITE SHELTER 10ft x 6.5ft

Страница 1: ...f Turf Instant Shelters the leading supplier of pop up event shelters within the Canada and North America Our Instant Shelters are designed to be simple to erect however we strongly recommend reading our instructions fully before using the Instant Shelter and keeping them with the Shelter at all times We recommend that no more than 2 people erect this Instant Shelter to avoid the risk of damaging ...

Страница 2: ...Up Your Sidewalls 8 9 Securing The Frame 10 Using Anchor Kit 11 Tips For Dismantling 12 Canopy protector bag 12 General Care 13 Maintaining Your Investment 14 15 Warranty Refunds Returns Policy 16 18 Spare Parts List 19 21 Should you require any further help or information please contact us at info gosurfturf com ...

Страница 3: ... Step 3 Extend The Frame With your partner on the opposite side grab two legs slightly lift and walk back wards away from eachother Stretch your arms out as far as they can go Receiving Your Instant Shelter Important note on shipped products The moment you receive your packages please ensure they don t have any signs of damage If you feel that there might be missing pieces or damage write down you...

Страница 4: ... corners of the canopy and hang on the leg in preperation for step 6 Step 6 Anti Sag Bolts In the small canvas bag that comes with your frame you will find rope anchor stakes and the Anti Sag Bolts see image left With the frame low to the ground insert your bolts Install the threaded bolt through the grommet of the canopy and into the threaded hole in the legs Once threaded secure the velcro in th...

Страница 5: ... at the top of the leg as possible Don t have a partner For setting up solo place one hand on the top three way joint and one under the bottom joint Squeeze them together as you walk backwards as seen in image three left If you have a 15 or 20 x 10 do this from the 10 side and squeeze the framework together This will extend the framework You will see now that the corner sliding leg joint with the ...

Страница 6: ...shelter Slightly roll up the canopy material in the corners and push up the cross bar sections as seen in image two Once a leg is locked in your partner can release the center apex All legs have a spring loaded pull pin that will automatically lock into place once over its final hole setting Erecting Your Instant Shelter ...

Страница 7: ...nd and release the pull pin The inner leg will slide out The inner leg can now extend and be locked in at the required height If raising a 20 x 10 or 26 x 10 start by raising the middle leg and bring the two corners down afterwards Repeat for the other side This will prevent uneccessary stress on the frame Erecting Your Instant Shelter ...

Страница 8: ...the velcro leg straps as seen in image two Zip the next sidewall to the previous and pull tight before pressing to velcro Install in a clockwise or counter clockwise direction for all four Secure the velcro to the legs and insert the elasticated hooks into the leg hole as seen left to secure the bottom of the sidewall Setting Your Sidewalls After raising both sides the frame should be pegged throu...

Страница 9: ...s they look neat and professional If you struggle to join the final side use the additional 4 joining strip we have provided as seen above We recommend using this for the first few uses of the shelter until the material stretches slightly Setting Your Sidewalls ...

Страница 10: ...portant that the shelter is pegged or secured no matter what the conditions are Surf Turf Weight Options Sandbag Stackable Steel Waterbag If on hard standing ground some form of weights must be used Depending on the conditions these can be stacked to more or less weight ...

Страница 11: ...nto the ground at an angle and then pull the rope tight You can follow this process to add addition weights such as a bucket of sand Our Instant Shelters are robust and designed to be used in most weather conditions With that being said it is important that you assess the conditions on the day If the conditions get too severe you may need to take the shelter down to eliminate any risk of damage It...

Страница 12: ...st be taken to ensure the material is not trapped in the frame work When transporting our Instant Shelters we recommend standing the unit up If this is not possible then it is best to remove the canopy material to stop the risk of damage Tips for Dismantling White Cover CanopyProtection Bag comes included with all shelters Included with all of our stock colored and printed Instant Shelters is our ...

Страница 13: ...rage be sure to pull all sides of the canopy out about half way down the outside of frame This is to prevent the material getting caught in the cross member joints and to avoid tears and pinholes Put up each sidewall section while working in a clockwise direction as you zip up each side make sure the zippers are on the outside of the leg If the zipper is not in the middle of the leg when zipping t...

Страница 14: ...your Surf Turf Shelter in adverse weather conditions Our products can be erected and dismantled within just a few minutes and it is the responsibility of the owner to determine if it is safe for the structure to remain up depending on the conditions Please note that although we at Surf Turf are confident in the quality of our shelters they are not sold or marketed as permanent structures and shoul...

Страница 15: ... items that you receive from us beforehand and also that you erect the shelter and check it over This is to ensure you re happy with the product itself and should ease the process of setting up the product by the time you need it for your event When using the anchor kit as suggested and dismantling the shelter please ensure that the pegs are not pulled out by dragging the sidewall and the peg alon...

Страница 16: ...not cover misuse weather damage improper assembly and disassembly or reasonable wear and tear Should you believe you have a manufacturing fault on your Instant Shelter you must Contact Surf Turf Instant Shelters immediately either by phone or email Provide photographic evidence of the fault via email Surf turf Instant Shelters at our discretion will then either repair or replace the item if we bel...

Страница 17: ...elivery when returning goods to us so that you can track the item to ensure it reaches us and that we have acknowledged receipt of the goods 1 7 Please note Surf Turf reserves the right to refuse return therefore please ensure that before any product is returned to us you have notified our office to ensure we are happy to receive the goods 1 8 Once you have contacted us regarding the return we wil...

Страница 18: ... back without a valid reason such as a manufac turing fault 1 13 We reserve the right to repair or replace goods which have been proven faulty 1 14 We reserve the right to issue a credit note by way of a refund to the value stated in 1 4 1 15 Please note that if your time for return as stated in 1 2 has expired then your rights for refund returns as outlined may have also expired 1 16 If at any po...

Страница 19: ...B20 Double Cross Bar With Connector 30 BB2 Middle Upper Leg 34 BB6 Lower Centre Pole 34 BB9 Centre Pole Sliding Bracket 10 BB5 Top Centre Pole 29 Prices plus HST Delivery BB3 Inner Leg 25 BB1 Corner Upper Leg 34 BB26 Corner Leg Complete 55 BB25 Middle Leg Complete 55 www gosurfturf com info gosurfturf com ...

Страница 20: ...Bar Connector 6 BB17 Plastic Bung For Cross Bar Ends 1 BB19 Cross Bar Connector Nut Bolt 3 Cross Bar To Joints BB21 Screw To Attach 1 BD19 Screw To Attach Joints To Legs 1 BA20 Pull Pin 5 BA19 Bauble 5 BB24 Middle Leg Top Joint 10 Prices plus HST Delivery 10 10 BB18 Rubber Washer For Cross Bar Connector 50 BD20 Screw To Attach Pull Pin To Joint 1 www gosurfturf com info gosurfturf com ...

Страница 21: ......

Отзывы: