background image

ATF Silent Glide Boat Shade

I

NSTALLATION

I

NSTRUCTIONS

SURESHADE

PO Box 51294
Philadelphia, PA 19115
Tel: 1-877-333-8323
International: 215-673-2307
www.sureshade.com

S U R E S H A D E

®

  T E C H N I C A L   D O C U M E N T A T I O N

Содержание ATF-SG

Страница 1: ...lide Boat Shade INSTALLATION INSTRUCTIONS SURESHADE PO Box 51294 Philadelphia PA 19115 Tel 1 877 333 8323 International 215 673 2307 www sureshade com S U R E S H A D E T E C H N I C A L D O C U M E N...

Страница 2: ......

Страница 3: ...uct Warranty Statement 2 SureShade ATF SG Silent Glide Shade 4 ey ene ts of Sureshade ATF SG Silent Glide 4 Upgrading to ATF SG Silent Glide Shade 4 SAFETY 7 Safety Descriptions 7 Important Safety Mes...

Страница 4: ...ing the Crossbars 28 6 Pre loading the Canvas 30 7 Wiring the Electrical System 33 8 Initiating the Sureshade ATF SG Intelligent Control Box ICB 36 9 Initiating the Remote Key Fob 36 Using the Momenta...

Страница 5: ...identi ed by the serial number located on the control box Please do not remove this label The canvas is identi ed by the white tag sewn into the canvas Please do not remove this label CONTACT INFORMAT...

Страница 6: ...ns improper stowage for ground transportation inclement weather or other act of nature Damage resulting from leaving the shade extended unattended during inclement weather Damage resulting from leavin...

Страница 7: ...n number Date of shade purchase or in the case of factory install date of boat purchase Details of the installation Factory install Dealer install Private install SureShade will make every e ort to tr...

Страница 8: ...urce which draws 3 amps at 12VDC single 5 amp slow blow fuse rather than drawing from two power sources that combine at 14 amps at 12VDC single 15 amp fuse and another 5 amp fuse with the legacy syste...

Страница 9: ...nt Glide shade is also available as an aftermarket installation Dealers can earn both sales and installation service revenue by upgrading existing clients to ATF SG Silent Glide or when selling new af...

Страница 10: ...GENERAL INFORMATION 6 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...

Страница 11: ...ement that follows the safety alert symbol WARNING Indicates a potentially hazardous situation that if not avoided could result in death or serious injury CAUTION Indicates a potentially hazardous sit...

Страница 12: ...vigation lights or any other boat accessories When tensioning the canvas refer to http www sureshade com service and technical documentation for proper roller pre load instructions Improper tensioning...

Страница 13: ...n Guide SAFETY LABEL LOCATIONS Safety labels must be legible to alert personnel of safety hazards Replace any illegible or missing labels immediately Safety labels removed during any repair work must...

Страница 14: ...SAFETY 10 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...

Страница 15: ...ge or hardtop Top surface mount Underside surface mount Roller Configuration Straight or cambered spring tension roller Roller Position Traveling or stationary Canvas Marine grade acrylic Sunbrella an...

Страница 16: ...SPECIFICATIONS 12 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...

Страница 17: ...ipping crate BEFORE starting installation See Figure 1 PART QUANTITY Shade speci cation drawing speci c to your shade and provided as a separate document 1 Mounting clamps w mounting hardware and bolt...

Страница 18: ...de ATF Installation Guide 1 2 3 4 7 6 5 Figure 1 Packing Contents 1 Outer Crossbar 2 Roller Assembly 3 Mid Crossbar 4 Electronic Controller Connections Wireless Remote 5 Mounting Clamps 6 Control Harn...

Страница 19: ...s X X Wire Crimper X X Utility Knife X X Assorted Wire Connectors X X Wire 8 gauge for power as per ABYC E 11 Table IX 10 Voltage drop 14 gauge for switch connections X X Multimeter or similar device...

Страница 20: ...l level Read tape measure Use hand drill Able to lift 35 lbs Electrical installation wiring of shade Wiring of shade to the boat should be done by an experienced marine electrician INSTALLATION TIME F...

Страница 21: ...erline of the port actuator tube to the centerline of the starboard actuator tube and is the most critical dimension in order to properly center the shade framework on the hardtop A Measure across the...

Страница 22: ...rt and starboard See Figure 3 VIEW A VIEW B 1 2 of the shade s centerline width 1 2 of the shade s centerline width Figure 3 Determining the Placement of the Mounting Clamps NOTICE Placement of mounti...

Страница 23: ...gure 5 Mounting Clamps may include spacers depending on installation OTE N Place mounting clamps 6 to 12 inches from aft of hardtop Spacing between forward and aft mounting clamps should be no less th...

Страница 24: ...to ensure measurements are correct Refer to shade centerline width located on shade speci cation drawing See Figure 7 Shade actuators used during this process to con rm proper shade position Figure 7...

Страница 25: ...es will ultimately be drilled narrower than shade centerline Mark location of mounting holes with a grease pencil Correct Placement of Mounting Brackets Mounting Hole Drill Line Shade Centerline Width...

Страница 26: ...Correct Placement of Mounting Brackets Adjust placement of brackets and mark holes here Mounting hole drill line Shade Centerline Width Mounting hole drill line Figure 10A Incorrect Placement of Mount...

Страница 27: ...unt For tops with curvature use distance from shade centerline to the marked mounting hole location to aid in placing remaining mounting clamps Figure 12 Curved Surface Mount NOTICE Re measure and ens...

Страница 28: ...clamp bolts Do not overtighten to the point where the surface material starts to buckle I Line up and install the four mounting clamps to the hardtop using the included 5 16 18 bolts and tighten down...

Страница 29: ...ware Do not tighten as forward aft adjustments may be needed C Measure from the telescoping end of the stationary actuator tube to the aft mounting clamp There should be no less than 4 inches between...

Страница 30: ...when installed A Slide the roller assembly onto the actuators B Ensure roller clamps are aligned over Place Roller Clamp Here stickers 2 inches in from the end of the actuator main tube See Figure 15...

Страница 31: ...asure approximately 1 inch See Figure 16 2 Measure the space between the mid actuator tube and the small extending actuator tube It should measure approximately 2 inches See Figure 16 3 If measurement...

Страница 32: ...NOTICE Do not remove the 10 32 set screws that connect the outer and mid crossbar sleeves to the crossbars Do not remove this screw Remove and retain this screw from each end before installing onto ac...

Страница 33: ...nds of the outer crossbar See Figure 19 Do not remove this screw Remove and retain this screw from each end before installing onto actuator Figure 19 Outer Crossbar Screw Location 2 Slide the aft cros...

Страница 34: ...nsion spring and prevent the roller from working Go to http www sureshade com service and technical documentation to view a video on how to properly pre load the canvas A Pre load the roller 5 10 full...

Страница 35: ...wards you and towards crossbars You will begin to feel the tension of the roller after about 3 to 4 full rotations Continue as needed until canvas is taut See Figures 22 and 23 Figure 22 Tension Rolle...

Страница 36: ...tion Guide B Holding the canvas rmly pull the canvas to the aft crossbar See Figure 24 Figure 24 Pulling Canvas to Outer Crossbar C Attach the zipper of the canvas to the crossbar and fully zip the ca...

Страница 37: ...nstallation Aftermarket only Ensure all wire connections are secure and watertight Refer to the American Boat Yacht Council ABYC E 11 AC and DC Electrical Systems on Boats OTE N When calculating wire...

Страница 38: ...4 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide Connect the positive and negative wires to a power source View the electrical schematic for more details See Figure 26 Figure 26 Elect...

Страница 39: ...INSTALLATION 35 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide Table 1 DC Wire Selection...

Страница 40: ...r a stuck switch relay DO NOT PROCEED WITH CONNECTING ACTUATORS until you have the LED blinking RED three times If the LED stays a solid YELLOW at this step prior to connecting either actuator you do...

Страница 41: ...seals on the actuators every few years to prevent excessive friction while actuators are traveling Following the recommended cleaning schedule may prolong this period but replacement will eventually...

Страница 42: ...s and mechanical components SureShade recommends that customers take proper precautions to avoid damage during winter storage or ground transportation for winter storage which include fully retracting...

Страница 43: ...com service and technical documentation Voltage drop when extending retracting shade Boat battery is not fully charged Incorrect wire is being used Loose wiring connections Ensure boat s batteries ar...

Страница 44: ...tatus LED will turn RED When the controller is not receiving a signal to move i e the shade is idle the status LED light will be GREEN LED LIGHT COLOR INDICATION ACTION REQUIRED GREEN Controller is re...

Страница 45: ...TROUBLESHOOTING 41 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide Figure 27 Electrical Wiring Diagram...

Страница 46: ...TROUBLESHOOTING 42 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide Figure 28 ICB Control Box...

Страница 47: ...TROUBLESHOOTING 43 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...

Страница 48: ...TROUBLESHOOTING 44 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...

Страница 49: ......

Страница 50: ...SureShade P O Box 51294 Philadelphia PA 19115 Phone 877 333 8323 www sureshade com ATF Installation Guide 2018 Rodan Enterprises LLC t a SureShade...

Отзывы: