3.0 Receiver Setup and Operation
- 18 -
l
Ethernet Output 1 GigE: Traditional automation communication is provided via port 1025 on the Ethernet connection. This primary port is a
Sur-Gard standard output and provides Sur-Gard standard automation protocol output.
CAUTION: The Ethernet communication lines must be connected first to an approved (acceptable to the local authorities) type NID (Network Interface
Device) before leaving the premises (e.g., UL installations, UL60950 Listed NID).
NOTE: All external devices should be mounted in the same room as the receiver.
All circuits are power limited except AC input.
Maintain 6.5 mm (1/4 inch) separation between power limited and non-power limited circuits.
All outputs are supervised.
3.1.1 Receiver installation
Sur-Gard recommends testing the receiver before actual installation. Becoming familiar with the connections and setup of the unit on the workbench sim-
plifies the final installation.
The following items are required:
l
1 IEC power supply cord per SG-PSU5
l
Philips #1 screwdriver
l
Phillips #2 screwdriver
l
5/16 inch [or 8 mm] nut driver
l
Depending on rack mounting:
l
8 clip nuts for the 19-inch rack
l
8 screws to fit into the clip nuts
1. Unpack the components for the SG-System 5.
NOTE: Carefully unpack the receiver and inspect for shipping damage. Notify the carrier immediately of any apparent damage.
2. Mount the rails to the 19-inch rack:
a. Slide the rails together.
b. Insert the clip nuts into the 19-inch rack 1U apart on the front and the back of the rack, leaving minimum 4U of space from the bottom
of the rail.
c. Place the rails and then secure in place with rack screws (four per rail, two on the front and two on the back).
d. Unfasten the front rail screws and set aside.
FIGURE 3-4: Rail installation
NOTE: Maximum distance between front and rear rails is 31 inches (78.74 cm)
CAUTION: This component is heavy and requires two people to lift. Keep fingers clear of rails.
3. Slide the SG-MLRF5 subrack onto the rails.
4. Unfasten the thumb screws and open the front plate.
5. Fasten the thumb screw set aside from the rails.
Содержание System Five
Страница 6: ...1 0 Table of Contents 6...
Страница 76: ...6 0 Options 76 FIGURE 6 3 Flow diagram for Fallback Mode 1...
Страница 77: ...6 0 Options 77 FIGURE 6 4 Flow diagram for All Mode 2...
Страница 78: ...6 0 Options 78 FIGURE 6 5 Flow diagram for IP Fallback Mode 3...
Страница 154: ......