Pipe centres left to right
=
Pipe centres from wall
=
Depth from wall
=
width of radiator plus valves
70mm
120mm
Drawings
Pipe Centres
www.supplies4heat.co.uk 01342 306880
Aluminium Radiator in White
Horizontal and Vertical
Please read these instructions and terms and conditions carefully
prior to installation. Failure to do so may invalidate the warranty.
SAXON
Fitting Instructions
Drawing 2 - Bracket Positions
Drawing 1 - Bush Configurations
2 x Right
Hand
Brackets
2 x Left
Hand
Brackets
Tighten ‘S’
Anti-clockwise
Tighten ‘D’
Clockwise
SAX_IR_1.1
SAXON radiators have specific left and right hand threaded
bushes and these can be easily damaged if forced or incorrectly
fitted (this will inevitably cause leaks).
Bushes require a dry fit
connection only; you must not use any Compound materials
(e.g. Jet Blue) or Plumbers Hemp.
I
f you choose you may use
up to 4 turns of PTFE tape to help seal the threads (the tape
should be applied in the direction of the thread and no more
than this amount should be used as this may cause leaks to occur)
If looking directly at the front of the radiator, the two
bushes with an ‘S’ cast on them are positioned on the
left and turned anti-clockwise. The two bushes cast with
a ‘D’ are positioned on the right and turned clockwise.
Please see Drawing 1