2-6
S
UPER
S
ERVER 5016T-MRB/5016T-MR-LN4B User's Manual
Figure 2-3. Installing the Server into a Rack: Basic
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next
step is to install the server into the rack. Do this by lining up the rear of the chassis
rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping
the pressure even on both sides (you may have to depress the locking tabs when
inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should hear the
locking tabs "click".
Содержание SuperServer 5016T-MR-LN4B
Страница 1: ...SUPER USER S MANUAL Revision 1 0a SUPERSERVER 5016T MRB SUPERSERVER 5016T MR LN4B...
Страница 5: ...v Preface Notes...
Страница 10: ...Notes SUPERSERVER 5016T MRB 5016T MR LN4B User s Manual x...
Страница 16: ...1 6 SUPERSERVER 5016T MRB 5016T MR LN4B User s Manual Notes...
Страница 28: ...2 12 SUPERSERVER 5016T MRB 5016T MR LN4B User s Manual Notes...
Страница 32: ...3 4 SUPERSERVER 5016T MRB 5016T MR LN4B User s Manual Notes...
Страница 98: ...A 2 SUPERSERVER 5016T MRB 5016T MR LN4B User s Manual Notes...
Страница 103: ...C 3 Appendix C System Specifications Notes...