2-8
Publication: 0028607
PRE-OPERATION
2
Water System
CAUTION
1.
Locate a known sewer line that is as large as
possible and is long enough to pay out all the hose
on the reel.
NOTE
The sewer line must not be located in residential
areas to avoid damage to homes and businesses
when using maximum water pressure.
2.
Pay out the entire length of sewer hose at the lowest
possible pressure (800 psi).
3.
When all the hose is paid out, increase the water
pressure to maximum and rewind the hose back onto
the reel under pressure.
The system consists of water tanks (1) saddled along the
side of the debris body (2), a water pump (3), a suction
line shutoff valve (4), and a Y-strainer (5).
Figure 2-12
When purchasing a new truck or when installing a
new sewer hose on an existing reel, you must
follow a procedure to pressurize the new hose
(one time only).
Failure to follow this procedure could result in
loose wraps and/or severe pinching of the hose
and possible damage to the reel itself.
5
3
2
1
4
Содержание Camel 1200 (Dump Body)
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 62: ...1 52 Publication 0028607 SAFETY 1...
Страница 64: ...2 2 Publication 0028607 PRE OPERATION 2 Figure 2 1 Figure 2 2 1 3 2 5 6 4 7...
Страница 106: ...4 18 Publication 0028607 SEWER CLEANING TYPICAL SEQUENCE 4...
Страница 118: ...5 12 Publication 0028607 WATER RECYCLING SYSTEM 5...
Страница 132: ...6 14 Publication 0028607 LUBRICATION AND MAINTENANCE 6...
Страница 156: ...i vi Publication 0028607 IX...
Страница 157: ......