![Super Hot 12BT Скачать руководство пользователя страница 1](http://html1.mh-extra.com/html/super-hot/12bt/12bt_installation-and-service-manual_1401898001.webp)
PN4152451
INSTALLATION AND SERVICE MANUAL
FOR HYDRONIC HEATING APPLICATIONS
6 kW to 54 kW, 208 Vac to 600 Vac, Single or Three Phase
BT SERIES ELECTRIC BOILER
WARNING
Risk of electric shock. This unit may be connected to more than one
electrical circuit. Disconnect all electrical circuits before servicing.
IMPORTANT
•
The boiler must be installed in accordance with all applicable national, provincial/state,
and local codes, laws, regulations, and ordinances.
•
This manual must be left with owner and should be located adjacent to the boiler for
reference.
•
Ensure boiler is full of water before turning on electricity. Elements will burn out
immediately without water in the boiler.
•
A boiler installed above radiation level (or as required by an Authority having
jurisdiction) must be provided with a low-water cut-off device at the time of boiler
installation.
•
Overcurrent protection between the power supply and the boiler must be provided in
accordance with the related national and/or local codes.
•
Always ensure power is turned off before servicing.
•
Electrical wiring or internal controls must be serviced by a qualified electrician. Any
adjustment of the internal controls must be performed by a qualified service technician.
Manufactured by
Allied Engineering Company
Division of E-Z-Rect Manufacturing Ltd.
Manufacturers of Gas and Electric Boilers, Stainless Steel Tanks, Tankless Coils, Electric Boosters
94 Riverside Drive, North Vancouver, B.C. V7H 2M6
•
Telephone (604) 929-1214
•
FAX (604) 929-5184
Branches: Calgary
•
Edmonton
•
Toronto
Post these instructions in a visible place.
DATE OF INSTALLATION :
INSTALLED BY :
PHONE :
Featuring our newest
“BiTronic Control System”
(OPTIONAL)