SunWize Power Ready Express Скачать руководство пользователя страница 1

The purpose of this guide is to assist you in setting up your 

system quickly and efficiently.

Quick Start

Sunwize Power Ready Express

Important! Prior to field installation

Determine and fill in the information below. Refer to 

http://

www.ngdc.noaa.gov/geomag-web/#declination

 to determine 

required information using site Lat./Long. or zip code. See 

page 7 for detailed instructions.

Array tilt angle                                                 

Magnetic declination                                       

See inside for list of required tools and additional materials.

For technical support call 866-827-6527

Share your installation photo:

email to [email protected]

Document # 310002

Содержание Power Ready Express

Страница 1: ...nformation below Refer to http www ngdc noaa gov geomag web declination to determine required information using site Lat Long or zip code See page 7 for detailed instructions Array tilt angle Magnetic...

Страница 2: ...Allen Wrench 3 16 Allen wrench Magnetic compass Tape measure Grease pencil chalk scribe or other marker Digital multi meter Digital clamp on Amp meter optional Photovoltaic PV modules generate electr...

Страница 3: ...ed maximum height using supplied band clamps or u bolts per the manual provided with the mount Top of Pole Mount Attach array with the gimbal to the top of the pole per the manual provided with the mo...

Страница 4: ...Ground Mount 1 Turn array to face South 2 Assemble per the manual provided with the mount 1b PV Array Installation Ground Mount For Reference Only...

Страница 5: ...and tighten bolts 2Enclosure Installation Install the lower mounting bracket Spacing should be measured from the upper bracket as follows Model Xinches mm WF2 or WF4 battery enclosure 23 584 2 F1 or F...

Страница 6: ...al If your system comes with an I O panel mount it to the side studs of the enclosure using the same procedure 5 Verify all breakers are in the OFF open position 6 Ground the control panel to the encl...

Страница 7: ...the PV array GREEN GND conductor per instructions in grounding section 3 For parallel connections use provided PV output parallel connectors see figure right Note If your system comes with a Combiner...

Страница 8: ...t provided 2 Inside the enclosure mate the PV array PV conductor to the controller PV termi nal block Mate the BLACK PV conductor to the controller PV terminal block Mate the PV array GREEN GND conduc...

Страница 9: ...nal Repeat this pattern foe each parallel pair For 48V systems Each quadruple set of 12V batteries are in series and form one string Connect the BLK jumper from BAT 1 NEGATIVE terminal to the BAT 2 PO...

Страница 10: ...AT terminal block to the BAT terminal block or the BANK to the BANK to verify that they are approximately 12V systems 12 13V 24V systems 24 26V 48V systems 48 52V Set breakers to the ON closed positio...

Страница 11: ...the Load breaker CB3 OFF D Connect your equipment to the terminal blocks on the control panel 2 Turn the Power Ready System ON A Turn the Battery breaker CB2 ON B Turn the PV breaker CB1 ON C Turn Loa...

Страница 12: ...at Washington D C true south is the same as 180 11 191 indicated If the local declination found in step 2 is positive true south is that number of degrees subtracted from magnetic south For example at...

Отзывы: