63
Tie the chain or thick rope on the chassis frame,
don’t traverse or press the chain or thick rope
on the hydraulic pipe or hose.
Figure 4.1.7
Transportation
Place chocks at the front and rear of crawler to fasten machine.
Fasten the 4 corners and foreside attachment of machine on the
trailer with chain or thick rope (As figure 4.1.7).
Unloading
【
Important
】
Prevent the possible damage to working device. During unloading, keep the angle between
arm and boom as 90°, unloading with arm retracted may cause the machine damaged.
A.
When the machine travel from trailer bed to slope as illustrated, place the bucket to the ground as figure,
the angle between arm and boom should be 90
--110
(As figure 4.1.8).
【
Important
】
Prevent the possible damage to the hydraulic cylinder. Don’t allow the bucket to collide
with the ground.
B.
You must place the bucket to ground before the machine
heel over (As figure 4.1.9).
C.
During the excavator moving forward, lift boom and
extend arm, until the excavator leave the slope.
4.5 STORAGE
Long-term storage of machine
While storing the machine, retract the cylinder piston rod to the inside of cylinder as much as possible to avoid
The machine should travel at lowest speed on slope.
To avoid turning when move on slope, if need turning, the
machine should return to the ground or trailer bed,
modify the travel direction, then pass the slope.
The intersection of slope top and trailer bed is
protuberant, pass it carefully.
90
0
~110
0
Figure 4.1.9
Figure 4.1.8
90
0
~110
0
Содержание SWE50B
Страница 24: ...17 2 1 CAB As figure 2 1 shown Figure 2 1...
Страница 38: ...31 No step on label...
Страница 92: ...85 5 4 11 Hose...
Страница 119: ...112 Engine Fault Diagnosed Code...
Страница 120: ...113...
Страница 121: ...114...
Страница 129: ...122 6 1 4 Circuit Diagram 2R 2RL 2B FUSE 100 F 50V 100 F 50V motor sw motor relay FUSE B G R...
Страница 131: ...124 6 1 6 Hydraulic Diagram...
Страница 136: ...129 6 2 4 Circuit Diagram 2R 2RL 2B FUSE 100 F 50V 100 F 50V motor sw motor relay FUSE B G R...
Страница 138: ...131 6 2 6 Hydraulic Diagram...
Страница 143: ...136 6 3 4 Circuit Diagram...
Страница 145: ...138 6 3 6 Hydraulic Diagram...
Страница 150: ...143 6 4 4 Circuit Diagram...
Страница 152: ...145 6 4 6 Hydraulic Diagram...
Страница 157: ...150 6 5 4 Circuit Diagram...
Страница 159: ...152 6 5 6 Hydraulic Diagram 280...
Страница 164: ...157 6 6 4 Circuit Diagram...
Страница 166: ...159 6 6 6 Hydraulic Diagram...
Страница 171: ...164 6 7 4 Circuit Diagram...
Страница 173: ...166 6 7 6 Hydraulic Diagram...
Страница 178: ...171 6 8 4 Circuit diagram...
Страница 185: ...178 6 9 4 Circuit Diagram...
Страница 192: ...185 In order to prevent misoperation please cover the protective lid when there is no need to operate break hammer...