background image

Website: www.sunsynk.com    E-mail: [email protected]

   

 7 

The brackets are padded in the inside to prevent any damage caused by the metal to the battery sleeve. 

There are two Phillips screws per bracket, and the holes in the mounting board are already threaded. 
Each battery pack comes with two sets of leads. 

In the installation process, we are only concerned with the pair that is black and red. 

Place the batteries sideways into the container with the leads heading towards the PCB, with the black 
leads secured out of the way. 

The bracket should be placed over the batteries and secured in place by the two screws. The holes in 
the metal mounting board are clearly visible. 

5.2. Mounting the System 

1. Install the solar panels using the L brackets provided and connect the cables to the PB 300 XL.
2. Mount the PB 300 XL onto a non-flammable wall.

Solar panels can be installed either on the roof or the ground. When selecting the location to install solar 

panels, several conditions must be taken into account. We will address some technical considerations 
and details that you should pay attention to before choosing where to install your solar panels. 

position is not corrct

Содержание 300 XL

Страница 1: ...and 1kWh Lithium Battery Bank USER MANUAL Global Tech China Ltd 3 Floor Wai Yip Industrial Building 171 Wai Yip Street Kwun Tong Kowloon Hong Kong Tel 852 2884 4318 Fax 8522884 4816 www sunsynk com sa...

Страница 2: ...4 3 APPLICATIONS 5 4 TECHNICAL SPECIFICATION 6 5 INSTALLATION 6 5 1 ASSEMBLING THE POWER BANK 6 5 2 MOUNTING THE SYSTEM 7 6 WIRING 8 6 1 THE AC THREE WAY CONNECTOR 8 7 OPERATION 9 7 1 SWITCHING ON 9...

Страница 3: ...utlet It can run TVs computers lights fans and any other utility within its operating limits The unit can power a mixed load with power up to 300W and battery storage of 1000Wh In addition to that it...

Страница 4: ...ight Only Full Charge Charging Night only On Also includes Cables and connectors 300W inverter 230V output Lithium battery digital charge controller Digital voltage meter User resettable overload fuse...

Страница 5: ...ver 5 hours 2 x 125W solar panels 1 x PB 300 XL 1kWh 5 x 20W LED security floodlights Classroom Pack over 4 hours 2 x 125W solar panels 1 x PB 300 XL 1kWh 1 x multi socket outlet AC 4 Laptop computers...

Страница 6: ...Net Weight 13 5 kg Operating Temperature 20 to 50 C Weatherproof IP 45 Power Bank Material Coated Mild Steel Solar Panels Pmax 125W Batteries 2 x 25 2V 17 6Ah lithium ion cells wire AWG 16 x Lmin 300...

Страница 7: ...ith the black leads secured out of the way The bracket should be placed over the batteries and secured in place by the two screws The holes in the metal mounting board are clearly visible 5 2 Mounting...

Страница 8: ...ly with an object that continually causes shades in the PV array therefore you must consider the presence of nearby trees chimneys antennas or houses that could cause shade on your solar panels 6 WIRI...

Страница 9: ...p beep System high temperature indication Beep beep beep beep beep beep beep beep beep beep System short circuit indication Once the PB 300 XL has been fixed into a suitable location solar panels wire...

Страница 10: ...le fumes or gases 6 Make sure the vent holes and fan grill are not obstructed to prevent overheating 7 Only used approved cabling when making a solar power system 8 PB 300 XL is designed to use 2 x 44...

Страница 11: ...ales globaltech china com 11 Global Tech China Ltd 3 Floor Wai Yip Industrial Building 171 Wai Yip Street Kwun Tong Kowloon Hong Kong Tel 852 2884 4318 Fax 8522884 4816 www sunsynk com sales globaltec...

Отзывы: